← Public Policy India
A Public Policy India data projectMany Indias

Many
Indias.

India is not one country, statistically speaking. Pick the state you live in below. In a few seconds you’ll see what your India actually looks like, on nine indicators that shape everyday life, compared against the national average or any other state you want to stack it up against.

Then drag the decade slider to see how the country has moved over the past decade. The chapters at the top go deeper on each theme.

…

Select a state above.

Decade sliderDrag below to change year

India, over a decade.

Five national indicators, shown only for the years they were actually measured. Where a survey was not run in a year, the latest measured value is shown with its year. Survey-year figures (PLFS, National Health Accounts) are placed in the year the survey period ends. From 2025 the PLFS publishes its annual report on a calendar-year basis; the 2025 round puts women’s participation at 40.0% (MoSPI, March 2026). Because the survey period and design changed, the series here stops at the last July-June round, 2023-24.

2024
← drag to change year →
In plain termsWhat this means for you

The story in your data.

The decade, in review2014 → 2026

Quiet shifts.

Several indicators that define everyday life have moved substantially over the past decade. Not every number has improved, and progress varies sharply by state, but the direction of travel on most is real. The figures below are rounded, draw from the sources cited on each card, and are meant to give a one-glance picture of the decade rather than a point estimate.

Rural tap water
17% → ~83%
rural households with a tap connection, August 2019 to November 2026 (Jal Jeevan Mission dashboard)
Out-of-pocket health
~64% → ~43%
of total health spending borne by households, 2013-14 to 2022-23
Women in workforce
~23% → ~42%
FLFPR, 2017-18 to 2023-24 (PLFS). Largely rural, much in self-employment.
Non-fossil electricity
~32% → ~53%
of installed capacity, 2014 to July 2026 (54%). The 50% mark, India’s 2030 NDC goal, was reached in June 2025. India ranks 3rd in installed renewable capacity (IRENA, 2026).
Real-time payments
<1% → ~50%
of global real-time-payment volume flowed through India in 2023 (ACI Worldwide). UPI handled 25.47 billion transactions in October 2026 (NPCI). An IMF note (2025) describes it as the largest retail fast-payment system by volume.
Air pollution (national)
~41 µg/m³
population-weighted annual PM2.5 in 2023 (AQLI), more than eight times the WHO annual guideline of 5. Unlike the cards above, this one has not moved much in a decade.

Figures are rounded; sources are cited on the corresponding metric cards above and in each chapter. Not every indicator has moved in the right direction: groundwater in the North-West remains over-drawn, graduate youth unemployment remains stubborn, and air pollution is still far above safe levels. The overall picture is not triumphant. It is also, for most people, better than it was a decade ago.

The declineMultidimensional poverty, 2013-14 to 2022-23

A quarter of a billion fewer Indians live in multidimensional poverty than a decade ago.

By NITI Aayog’s measure of deprivation across health, education, and living standards, the fall over the past decade is among the largest anywhere. The drivers are not mysterious: tap water (Chapter 02), sanitation (Swachh Bharat), insurance (PM-JAY, Chapter 05), housing (PMAY), gas connections (Ujjwala), bank accounts (Jan Dhan), and direct transfers (DBT) operating in concert. The state did not solve every problem; it solved enough of them in stacked combination to lift a number of people out of measurable destitution that exceeds the population of most countries.

Multidimensional Poverty Index
29.17% → 11.28%
National MPI headcount, 2013-14 to 2022-23. 24.82 crore people lifted out of multidimensional poverty in nine years (NITI Aayog).
World Bank LMIC poverty line
61.8% → 28.1%
Share below the lower-middle-income line of $3.65 a day (2017 PPP), 2011-12 to 2022-23. More than halved in just over a decade; about 37.8 crore people moved above it (World Bank).
Kerala
Extreme poverty, declared ended
Kerala declared itself free of extreme poverty on 1 November 2025, the first state to make such a claim. Its Extreme Poverty Eradication Programme identified 64,006 families in 2021; after deaths, untraced families and duplicates were removed, the state says all 59,277 remaining families were supported out of extreme poverty.

Sources: NITI Aayog Discussion Paper on MPI (January 2024); World Bank Poverty and Equity Brief, India (April 2025); Government of Kerala (2025). The MPI uses the Alkire-Foster method developed by OPHI, Oxford, and used by UNDP. India’s National MPI uses 12 indicators across health, education, and living standards. Different methodologies (income vs deprivation, World Bank vs national lines) report different magnitudes; the direction is consistent across all of them.

The liftHow a few states shape the national picture

A few states, a large share of the economy.

Most national-average figures mask a steep gradient. A small group of states, led by Maharashtra, Tamil Nadu, Karnataka, Gujarat and Telangana, produces far more of India’s output than its population share. Several of them are also ahead of the national average on indicators in this dashboard. The EAC-PM’s 2024 review of six decades of state data finds little sign of convergence between richer and poorer states.

30.6%
of India’s GDP in 2023-24 came from the five southern states (Karnataka, Andhra Pradesh, Telangana, Kerala, Tamil Nadu), which hold about a fifth of the population.
Source: EAC-PM Working Paper, September 2024
194%
Telangana’s per capita income as a share of the national average in 2023-24, the highest among large states after Delhi. Karnataka stood at 181% and Tamil Nadu at 171%.
Source: EAC-PM Working Paper 2024
~6×
approximate gap in per capita income between Telangana and Bihar, which sits at about a third of the national average.
Source: EAC-PM Working Paper, September 2024
3.8%
Kerala’s share of national GDP in 2023-24. The EAC-PM paper notes it is the only southern state whose share has fallen, even as its per capita income stays well above the average.
Source: EAC-PM Working Paper, September 2024

One way to read the dashboard above: the "India average" for most indicators is pulled sharply in one direction by the performance of a handful of states. Your state’s position in that gradient matters more than the national figure, which is why the compare-with dropdown lets you pick any state as your benchmark. The point is not that a few states are "carrying" the country, every state has its own story, but that the national number is an average of many Indias, not a picture of one.

Go deeperSixteen chapters

Read the chapters.

Each chapter goes into the history, the global peers, the best practices, and the policy levers for one theme. Pick one.

MethodologyOn the numbers

A note on the data.

Indian policy data is a mixed bag, and this dashboard reflects that. The last comprehensive Census was conducted in 2011. For a country whose population is estimated to have added over 20 crore people since then, that is a serious limitation. Most headline population-linked figures in public policy today, from state-wise demographic shares to per-capita estimates, are extrapolations. At best, educated guesstimates. We work with them because they are what the policy community works with.

Other datasets are genuinely current and high-frequency. The PLFS now publishes monthly and quarterly estimates. ASER releases annually. CPCB publishes real-time air-quality data. National Health Accounts estimates arrive with a lag of about three years. PM-JAY and Jal Jeevan Mission maintain live dashboards. Where the underlying data is timely and well-documented, we have used it directly.

A note on the Census: Census 2027 is under way; until its results are published, the 2011 Census remains the latest completed count. Many social and demographic indicators in Indian policy debates are still anchored to a 15-year-old baseline; treat all such figures as directional. Data sources used here: AQLI, University of Chicago (2025 India fact sheet, 2023 satellite-derived PM2.5) for air quality and life expectancy; CGWB 2024 assessment for groundwater; Jal Jeevan Mission dashboard (read 18 November 2026) for rural tap connections; MoSPI PLFS 2023-24 for female labour force participation; ASER 2024 (rural) for Std V reading; National Health Accounts 2022-23 for out-of-pocket expenditure, which publishes state estimates for 21 states only; Census 2011 for literacy and urbanisation, because it is the latest completed count. Census 2027 is under way, and its results will replace these two indicators once published. Where a source publishes no figure for a state, the card says so rather than estimating one.

State-level values are drawn from the rounds of each source named in the notes. Each state value is taken as published by the source named on its card. Treat every figure here as a directional indicator of scale and trend, not a point estimate. The first decimal matters less than the order of magnitude.

Part 01Environment · Public health

The air
we breathe.

The air between these words and your lungs, on a December morning in Delhi, can contain 300 micrograms or more of fine particulate matter per cubic metre. The World Health Organization’s guideline for a single day is 15. This is the scale of the Indian air problem. It is also a problem on which the policy architecture has matured considerably over the past decade, even as enforcement continues to catch up to ambition.

If you live in one of India’s northern cities, air pollution is not abstract. It is the grey haze on your terrace. It is the child who wakes up coughing in October. It is the schools that shut for days in November. And yet, for most of Indian history, it was an invisible problem, because there was no infrastructure to measure it.

That has changed, and quickly. India today runs one of the most extensive ambient air-quality monitoring networks in the developing world, about 1,600 continuous and manual stations in 2025, covering 584 cities (CREA). The CPCB’s SAMEER app publishes real-time data. The National Clean Air Programme (2019) set city-level PM reduction targets for 131 cities. The Commission for Air Quality Management (2021) coordinates action across Delhi-NCR and adjoining areas of Haryana, Punjab, Rajasthan and Uttar Pradesh. The measurement and policy infrastructure is in place. The enforcement muscle is still building.

Sanctioned posts
1122
Judges in place
781
Vacant posts
341

Population-weighted annual average PM2.5 by state, 2023, from satellite-derived estimates. Source: AQLI 2025 India fact sheet, University of Chicago. India’s national annual standard is 40 µg/m³; the WHO guideline is 5.

Global context

In IQAir’s monitor-based ranking for 2025, the most polluted countries were Pakistan (67.3 µg/m³), Bangladesh (66.1), Tajikistan (57.3), Chad (53.6), DR Congo (50.2) and India (48.9). The WHO annual guideline is 5.

The peer example everyone watches is China. In 2013, Beijing’s annual average PM2.5 was around 90 µg/m³. A decade of sustained enforcement, coal controls, emission caps, real-time plant monitoring, ultra-low-emission retrofits, and air-quality-indexed bureaucratic accountability, brought Beijing to about 32 µg/m³ by 2023. The trajectory is possible. It took China about a decade.

What has been doneA decade of architecture

The scaffolding, assembled.

Over the past decade, India has built a serious policy apparatus for air. Not a perfect one; not one matched by uniform enforcement. But the scaffolding that didn’t exist in 2012 is now real.

2015
Environment ministry launches the National Air Quality Index (April), starting with 10 cities. In December it notifies tighter SO₂, NOx and particulate limits for coal power plants, with a 2017 deadline that has since been extended several times.
2017
Graded Response Action Plan (GRAP) notified for Delhi-NCR in January, after a Supreme Court order: a staged emergency-response framework since revised several times.
2019
National Clean Air Programme launched, initially targeting a 20-30% cut in particulate levels by 2024 (against 2017) in 102 cities; the target was later revised to up to 40% for PM10 by 2025-26 across 131 cities.
2021
Commission for Air Quality Management established by Act of Parliament, a statutory body with binding authority over Delhi-NCR and adjoining areas.
2023
PM e-Bus Sewa approved (August) to support 10,000 electric buses in cities. The agriculture ministry’s crop residue management scheme, running since 2018, continues to subsidise machines that let farmers handle paddy straw without burning it.
2025
July: the environment ministry exempts most coal plants (Category C, over 75% of thermal capacity by CSE’s count) from SO₂ limits. Plants within 10 km of the NCR or million-plus cities must comply by the end of 2027.
2024-25
CAQM issues further binding directions on construction dust, industrial fuel switching and vehicle movement in the NCR.
01 · The costHuman toll, quantified

The burden, in four numbers.

~49µg/m³
India’s national average PM2.5 in 2025 in IQAir’s monitor-based ranking (48.9), down from 50.6 in 2024 and nearly ten times the WHO annual guideline of 5. India ranked sixth most polluted country, against fifth a year earlier.
IQAir World Air Quality Report 2025
~2.1 Mdeaths
in India in 2021 attributed to air pollution (outdoor PM2.5, household smoke and ozone together). The ICMR-led study in Lancet Planetary Health put the 2019 figure at 1.67 million. Methods differ; the scale is the signal.
State of Global Air 2024; India State-Level Disease Burden Initiative (2020)
~3.5 yrslost
of life expectancy for the average Indian from PM2.5 above the WHO guideline, based on 2023 data. In Delhi the figure is 8.2 years.
Air Quality Life Index (AQLI) 2025, University of Chicago
131cities
covered by NCAP, which did not exist before 2019. In 2025 the national monitoring network had about 1,600 stations (565 continuous, 1,035 manual).
MoEFCC; CREA, Tracing the Hazy Air 2026
What worksCases worth studying

Four case studies.

No country has solved air pollution without sustained enforcement. These are four cases that Indian policymakers, journalists, and citizens should know in detail.

India · 1998-2002

Delhi’s switch to CNG

In 1998 the Supreme Court, hearing the M.C. Mehta case, ordered Delhi’s public transport onto compressed natural gas. By the end of 2002 the city’s buses, autorickshaws and taxis had converted, among the largest such shifts anywhere at the time. The lesson: a hard, enforced deadline moved an entire fleet. The gains were later eroded as private vehicles multiplied.

China · 2013-2023

Beijing’s air transformation

Annual PM2.5 in Beijing fell from about 90 µg/m³ in 2013 to about 32 by 2023. Mechanisms: coal out of the city core, ultra-low-emission retrofits at power plants, bureaucratic accountability tied to air targets, and an enforcement regime that imposed real costs on violators. Sustained political will over a decade is the active ingredient.

India · 2017-ongoing

Graded Response Action Plan

The GRAP framework in Delhi-NCR, staged measures (from dust control to construction halts to school closures) triggered by AQI thresholds, is an Indian design for acting fast during pollution episodes. Its limitation is reactive design; its achievement is institutionalised response.

Global · 1970-present

The United States’ Clean Air Act

Between 1970 and 2020, under the Clean Air Act and its 1990 amendments, combined US emissions of six common pollutants fell 78% while GDP grew 272% (US EPA). The lesson most cited: strong standards plus credible enforcement work; voluntary programmes alone do not.

What would actually workSix structural levers

Six things that would move the curve.

01
Enforce what’s already on paper
The Commission for Air Quality Management has the legal authority to issue binding directions. Its 2023-25 enforcement has been more consistent than in the years before, across dust, fuel switching, and vehicular restrictions. Continuing to build that muscle, rather than adding new legislation, is the highest-leverage lever. Adequate CAQM staffing and budget are the structural blockers.
02
Fix stubble burning with economics, not moralising
Punjab and Haryana stubble burning contributes a significant share of NCR peak-winter PM. Machine subsidies, ex-situ use of straw (bio-CNG, biomass for power) and per-acre incentives in some states, such as Haryana, now exist. The question now is scaling further, faster, and critically, paying farmers for not burning rather than just penalising burning.
03
Accelerate the e-bus transition
PM e-Bus Sewa (10,000 buses) and PM E-DRIVE are the funding vehicles, but most Indian cities still run far fewer buses per person than they need. State-level procurement and depot capacity are the binding constraints.
04
Tackle thermal plant emissions, finally
Emission standards for thermal plants were notified in 2015 with a 2017 compliance deadline, extended several times. In July 2025 the environment ministry exempted most plants from SO₂ limits altogether, keeping them only for plants near the NCR and million-plus cities (by end-2027) and, case by case, near polluted areas. Holding that narrower line, and measuring the health effect of the exemption, is now the test.
05
Publish district-level health data
Respiratory-illness data gathered through disease surveillance and hospitals is rarely published at the district level. Making this public would let citizens and journalists connect local air quality to local health outcomes, a political driver that abstract national statistics cannot match.
06
Fund CAQM and CPCB properly
The Commission’s authority substantially outpaces its staffing and budget. The CPCB, which runs the measurement backbone, is similarly stretched. Scaling the technical arm of both would let them do the monitoring, modelling, and enforcement their mandate envisages. This is unglamorous, essential, and dramatically cheaper than most alternatives.
On the numbers

Ambient-air data in India relies on the CPCB monitoring network, state pollution-control boards, and independent datasets such as IQAir (monitor-based) and AQLI (satellite-based). The two measure differently and should not be mixed in one comparison.

Year-to-year changes in PM2.5 depend heavily on weather (wind, rainfall, mixing height), so a single cleaner year is not proof that policy is working. The policy architecture is real; short-run improvements should be read with that caveat.

Attribution of deaths to air pollution is always based on statistical models; different research groups (ICMR, IHME, Lancet, Global Burden of Disease) produce estimates in a broadly similar range. Treat such figures as indicative of scale, not point estimates.

The most recent Census of India is 2011; some population-linked metrics extrapolate from that baseline. The series notes caveats where particularly material.

Sources & further reading

Primary data: Central Pollution Control Board; IQAir World Air Quality Report 2025; Air Quality Life Index (AQLI), University of Chicago; CREA NCAP tracker; Commission for Air Quality Management.

Research: State of Global Air 2024; ICMR & Lancet Planetary Health India studies; CEEW Air Quality work; Down To Earth.

Policy: National Clean Air Programme (MoEFCC); Graded Response Action Plan documentation; Crop Residue Management scheme; PM e-Bus Sewa guidelines; SO₂ norms notification for thermal plants (July 2025).

Part 02Environment · Resource

The water
that isn’t there.

Punjab extracts well over 150% of its annual groundwater recharge. Rajasthan and Haryana sit in similar territory. These three states anchor India’s agricultural heartland and sit on aquifers that lose more water each year than they gain. The North-West is a crisis. The East has quality problems. The South has urban stress. And yet: about 16 crore rural households now have tap connections (82.65% on the Jal Jeevan Mission dashboard in November 2026), up from 3.23 crore when the mission began in August 2019. The all-India picture on groundwater has also improved at the margin: safe assessment units rose from 62.6% in 2017 to 73.1% in 2025. Two distinct stories running in parallel.

The imagery of the Indian water problem is usually Cape Town, that is, a city running dry. The Indian reality is structurally different. There is, in aggregate, enough water. The problem is that it is being extracted at rates the aquifers cannot sustain; that it is concentrated in the wrong places; that it is polluted in many of the places where it exists; and that the delivery infrastructure, until recently, covered only a fraction of rural households.

The Central Ground Water Board classifies assessment units by how much of annual recharge is being extracted. Below 70% is Safe. Between 70% and 90% is Semi-Critical. Between 90% and 100% is Critical. Above 100% is Over-Exploited, meaning the aquifer is depleting year-on-year.

About a quarter of India’s 6,762 assessment units (2025) fall into one of the three concerning categories or are saline. The concentration is geographically stark: the Green Revolution heartland of Punjab, Haryana, Western Uttar Pradesh, and Rajasthan are the hotspots. Groundwater levels in parts of Punjab have declined by over 10 metres in the past two decades.

Punjab
156%
Rajasthan
147%
Haryana
137%
Delhi (NCT)
98%
Uttar Pradesh
72%
Tamil Nadu
82%
Karnataka
69%
Maharashtra
55%
Kerala
53%
Andhra Pradesh
48%
West Bengal
44%
Odisha
43%

Stage of groundwater extraction (annual extraction as a percentage of extractable recharge), 2024 assessment. Source: Central Ground Water Board, via RBI Handbook of Statistics on Indian States, Table 107. Above 100% means more is pumped out each year than is replenished. The national figure was 60.5% in 2024 and 60.6% in 2025.

Global context

India’s average annual water availability per person was about 1,486 m³ in 2021 and is projected to fall to about 1,367 m³ by 2031 (Central Water Commission). On the widely used Falkenmark scale, below 1,700 m³ is water-stressed and below 1,000 m³ is water-scarce. India is already stressed, and moving towards scarcity.

Two peer examples everyone watches: Israel, which built drip irrigation, desalination and large-scale wastewater reuse on a fraction of India’s per-capita water; and Australia, which capped water extraction in the Murray-Darling Basin in 1995 and later built tradable water entitlements around that cap.

What has been doneThe tap-water decade

16 crore homes, connected.

The Jal Jeevan Mission is not a small thing. About 12.8 crore rural households have been given tap connections since August 2019, one of the largest drinking-water programmes anywhere. State-level execution has been uneven: Goa, Haryana, Telangana, Gujarat, Punjab, Himachal and others report 100% coverage, while Kerala, Jharkhand, West Bengal and Rajasthan remain below 60%. But the direction and pace are unambiguous.

2019
CGWB publishes its 2017 assessment of 6,881 units: 17.2% over-exploited, 62.6% safe. The scale of over-extraction becomes visible unit by unit.
2019
Jal Jeevan Mission (JJM) launched in August with the goal of a functional household tap connection for every rural household by 2024. At launch, 3.23 crore (16.7%) had one. The deadline was later extended to 2028.
2020
Atal Bhujal Yojana begins in 7 states, focused on demand-side groundwater management through community planning and incentives. Swachh Bharat Mission (Grameen) Phase II is approved, with a focus on ODF Plus villages and waste management.
2021
AMRUT 2.0 launched (October), taking forward the urban water-supply goal announced in that year’s Budget as Jal Jeevan Mission (Urban).
2022
Rural tap connections cross 10 crore (August), three years into the mission.
2026
The Union Cabinet restructures the programme as JJM 2.0, extended to December 2028, with total outlay raised to ₹8.69 lakh crore and the focus moved from connections to service: 55 litres per person per day, of prescribed quality, regularly. Coverage reaches 82.65% by November.
02 · The scaleWhat we know

Water, in four numbers.

~1,486m³
Average annual water availability per person in 2021, already below the 1,700 m³ water-stress line and projected at about 1,367 m³ by 2031.
Central Water Commission
~16 crhomes
Rural households reported with a tap connection (82.65% of 19.35 crore), up from 3.23 crore in August 2019. JJM 2.0 shifts the focus from connection counts to regular, safe supply, with a December 2028 deadline.
JJM dashboard, 18 November 2026
~25%units
Of India’s 6,762 groundwater assessment units are semi-critical (11.2%), critical (3.0%) or over-exploited (10.8%), concentrated in the North-West. The picture has improved at the margin: safe units rose from 62.6% (2017) to 73.1% (2025), and over-exploited units fell from 17.2% to 10.8%.
CGWB Dynamic Groundwater Resources Assessment 2025
~20%of samples
Of groundwater samples tested by the CGWB exceeded the safe limit for nitrate, with exceedances reported from 440 districts; fluoride, arsenic and uranium are problems in other pockets. Access to water is half the story; what is in it is the other.
CGWB Annual Groundwater Quality Report 2024
What worksFour cases

The playbook, in four cases.

India’s water challenge has both domestic and international precedent for what works. These four cases each illustrate a different piece of the solution.

Israel · 1960s-present

Drip irrigation and desalination

Israel’s water economy is the usual benchmark. Commercial drip irrigation took off there in the 1960s (Netafim was founded in 1965), and drip typically uses far less water than flood irrigation for similar yields. Desalination now supplies most of Israel’s household water, and most of its treated wastewater is reused in farming. In India, micro-irrigation still covers only a small share of irrigated land.

India · 2003-2009

Farmers who measured their own aquifer

The Andhra Pradesh Farmer Managed Groundwater Systems project, supported by the FAO, trained farmers in some 638 habitations across seven drought-prone districts to record rainfall and well levels and draw up a crop-water budget each season. Where farmers could see the water balance, many shifted to less thirsty crops voluntarily. It is one of the better-known precedents for the community approach in Atal Bhujal Yojana.

India · 2003

Tamil Nadu’s rainwater harvesting rule

In 2003 Tamil Nadu made rainwater-harvesting structures compulsory for all buildings, old and new, in its urban areas, among the first state-wide mandates of its kind in India. Chennai’s groundwater levels rose in the years that followed. Enforcement is uneven; the principle is sound. Replication in other water-stressed Indian cities has been limited.

India · 2019-ongoing

Jal Jeevan Mission

From 3.23 crore rural tap connections in August 2019 to about 16 crore by November 2026 (82.65%). Execution varies widely by state. JJM 2.0 (2026) pivots to regular supply, water quality and local operation and maintenance, the harder, less visible second half of the work.

What would actually workSix levers

Six things that would work.

01
Price water honestly
Punjab and Haryana essentially give away agricultural electricity, which directly subsidises groundwater pumping. Paying farmers directly, rather than through free power, is the most promising way to correct the incentive. Punjab’s Paani Bachao Paisa Kamao pilot (2018), which paid farmers for electricity saved against a metered entitlement, is the closest Indian experiment.
02
Diversify crops in water-scarce belts
Punjab grows paddy because MSP guarantees a market. Expanding effective MSP to pulses, oilseeds, and millets in water-scarce belts, with procurement backing, is the structural fix. The International Year of Millets (2023) and Budget 2025-26’s six-year Mission for Aatmanirbharta in Pulses, under which central agencies would buy tur, urad and masoor from registered farmers for four years, are early signals.
03
Mandate aquifer recharge in urban areas
Tamil Nadu’s 2003 rainwater-harvesting rule is the template. Applied broadly with real enforcement across Indian cities, especially in Bengaluru, Hyderabad, Delhi, and Pune, it would be among the cheapest interventions available. The building-bye-law changes are simple; the enforcement is the issue.
04
Scale drip irrigation, at the state level
Drip and sprinkler systems still cover only a small share of India’s cropped area. Central support for micro-irrigation dates to 2006 and now runs through the Per Drop More Crop component of PMKSY. Dramatically higher state-level subsidies (80-90%) and implementation through Farmer Producer Organisations would accelerate adoption. Maharashtra and Gujarat are ahead; Punjab and Haryana lag.
05
Close the urban sewage-treatment gap
CPCB’s 2021 inventory found treatment capacity for only about 44% of the 72,368 million litres of sewage that urban India generates each day, and actual treatment well below that. The Namami Gange programme has made measurable progress on the Ganga; extending the same discipline to smaller rivers and lakes is the next phase. The technology is not novel; financing and ULB capacity are.
06
Fund CGWB and hydrology research properly
India’s best atlas of groundwater is produced by a dedicated but chronically undersized institution. Scaling the measurement backbone, and making the data APIs accessible to researchers and citizens, is an unglamorous, high-return investment.
On the numbers

India’s groundwater data comes from the Central Ground Water Board’s Dynamic Groundwater Resources Assessment, updated periodically. The state chart uses the 2024 assessment, the latest with a complete state table to hand; national figures use the 2025 assessment. Methodology has been refined over successive rounds, so trend comparisons across decades require care.

JJM coverage data is reported by states and aggregated by the Ministry of Jal Shakti. A connection is not the same as regular, safe supply; functionality assessments and independent surveys are the check on that.

The most recent Census of India is 2011. Rural household totals extrapolate from that baseline. Treat all household-count figures as directional.

Sources & further reading

Primary data: Central Ground Water Board; Jal Jeevan Mission Dashboard; Ministry of Jal Shakti; Census of India 2011 village-level water sources.

Research: CEEW water security work; Mihir Shah Committee on Water Reforms; CPR water programme; Himanshu Thakkar, SANDRP.

Global reference: Israel Water Authority; Murray-Darling Basin Authority; FAO, APFAMGS project documentation; OECD water resource reports.

Part 03Livelihood · Labour

Where the
jobs aren’t.

India has been the world’s fastest-growing large economy for much of the past decade. Yet in 2022, unemployment among young graduates stood at 29.1%, nearly nine times the 3.4% rate among young people who cannot read or write (ILO-IHD). The gap between headline growth and quality jobs for under-30s is the deepest economic tension of this period. It is also a problem that has begun to receive more policy attention and budget than before.

Picture a 28-year-old engineering graduate from a tier-2 college in Madhya Pradesh. She has a BTech. She has a driving licence. She speaks English, Hindi, and passable Marathi. She has applied, over two years, for 140 jobs. She has received three offers, a BPO in Noida paying ₹18,000 a month, a bank-branch sales role in Indore paying a variable salary topping out at ₹25,000, and a data-entry role with no stated upper bound on working hours. She took none of them. She is studying for the SSC Combined Graduate Level examination for the third year running.

Multiply her by several million. That, statistically, is the Indian youth-employment problem.

It is easy to miss if you look only at the headline PLFS numbers. National unemployment (2023-24): 3.2%. Labour Force Participation Rate: about 60%. Female LFPR: 41.7%, up from 24.5% in 2018-19. Informal employment: well above 80%. The 2025 calendar-year round shows much the same picture (unemployment 3.1%, female LFPR 40.0%). These numbers, taken on their own, are not bad for an economy at India’s income level. The distress lies in the age- and education-disaggregated slice.

Graduates
29.1%
Secondary education or above
18.4%
Cannot read or write
3.4%

Unemployment rate among youth (15-29) by education, 2022. Source: ILO and Institute for Human Development, India Employment Report 2024, based on PLFS. The pattern looks counterintuitive: the more education, the higher the recorded unemployment. The explanation is that less-educated youth work more, but in subsistence or unpaid family labour, their distress is invisible in the statistic. Graduates are visibly "unemployed" because they are searching for the kind of formal job that should match their qualification.

Global context

The useful comparison for India is not the US or Germany; it is Vietnam and Bangladesh, both of which have moved rural workers into factory jobs at a pace India has not matched.

In World Bank data for 2025, manufacturing was 24.5% of GDP in Vietnam, 22.4% in Bangladesh and 23.7% in Thailand, against 13.5% in India, lower than India’s own share a decade earlier (15.1% in 2014). India’s national accounts, on a different basis, put the share somewhat higher, but the gap stands either way. This is the link between Chapter 15 (Growth) and Chapter 03 (Jobs), the two are versions of the same question.

What has been builtDecade of architecture

Scaffolding, assembling.

The policy machinery for India’s labour market has matured substantially over the past decade. Skill India, the four Labour Codes, PLI schemes, e-Shram, the employment-linked incentive and the 2024 internship scheme add up to a fuller toolkit than India has had before. Outcomes are uneven; the architecture is stronger.

2014-2020
Skill India Mission launched (2015). Pradhan Mantri Kaushal Vikas Yojana has trained about 1.64 crore people across its phases, but placement has stayed low: official data show roughly a fifth of those trained being placed, and a 2025 CAG audit flagged weak tracking.
2016
National Apprenticeship Promotion Scheme (NAPS) launched in August. It has grown, but a 2026 NITI Aayog review found apprenticeship uptake still far below potential.
2019-20
Parliament folds 29 central labour laws into four Labour Codes: the Code on Wages (2019) and the industrial relations, social security and occupational safety codes (2020).
2020
Code on Social Security 2020 formally recognises gig and platform workers. A structural acknowledgment of a new category of labour.
2020-26
PLI schemes launched across 14 sectors. By March 2026, about ₹2.4 lakh crore of investment and some 14 lakh jobs were reported (DPIIT). Heavily weighted toward capital-intensive sectors (electronics, pharma, auto).
2021
e-Shram portal launched (August) to register unorganised-sector workers. It passed 30 crore registrations in early 2025 and stood at 31.89 crore at its fifth anniversary in August 2026.
2023-24
Female LFPR reaches 41.7%, up from 23.3% in 2017-18, one of the sharpest rises in the survey record.
2024-25
Budget 2024-25 announces an employment package for 4.1 crore youth and an internship scheme with top 500 companies for 1 crore interns over five years (pilot from October 2024). The Employment Linked Incentive scheme, ₹99,446 crore aimed at 3.5 crore jobs, starts in August 2025 as PM Viksit Bharat Rozgar Yojana. The four Labour Codes come into force on 21 November 2025.
03 · The arithmeticFour numbers

The arithmetic of Indian work.

~83%
Of India’s unemployed were young (ages 15-29) in 2022. The youth challenge is the employment challenge.
ILO India Employment Report 2024
~29%
Unemployment among young graduates in 2022, the number that holds all the other labour statistics in tension.
ILO-IHD India Employment Report 2024
~42%FLFPR
Female Labour Force Participation Rate, 2023-24 (41.7%), up from 24.5% in 2018-19. A large shift, concentrated in rural self-employment.
PLFS 2023-24
~32 cr
Registrations on e-Shram, the unorganised workers’ platform launched in 2021 (31.89 crore in August 2026), one of the largest labour registries anywhere.
Ministry of Labour & Employment, 2026
What worksFour cases

Four case studies.

The Indian jobs question has both international and domestic precedent for what works. These four cases illustrate different pieces of the answer.

Vietnam · 1990-present

The manufacturing-as-employment model

Vietnam raised manufacturing from about 17% of GDP in 2010 to 24.5% in 2025 (World Bank), pulling millions of workers off farms. The ingredients: trade openness, disciplined courting of export-oriented FDI, high female labour participation, and vocational training tied to factory demand. India’s labour-intensive sectors face the same competition for the same buyers.

Germany · post-WW2

Dual vocational training

Germany’s dual system combines classroom learning with paid apprenticeships in over 300 recognised occupations. About 1.2 million people were in dual training at the end of 2025, and some 462,000 new contracts were signed that year (Destatis). Youth unemployment has long been among the lowest in the EU. India’s NAPS is the adapted framework; scale and quality are the gaps.

India · 2020-ongoing

PLI and the mobile phone story

The government counts 2 mobile-manufacturing units in 2014 and about 300 a decade later; phones sold in India went from mostly imported to almost entirely assembled at home, and India is now the world’s second-largest mobile manufacturer. Across 14 sectors, PLI schemes reported about 14 lakh jobs by March 2026. Assembly is labour-intensive; components and design, where value lies, are the next test.

India · 2019-ongoing

Free bus travel for women

Delhi (2019), Tamil Nadu (2021), Karnataka’s Shakti (June 2023), Telangana and others now let women ride state buses free. The effect on women’s paid work is still being studied, and early evidence is mixed. The premise is sound: transport access is labour-market infrastructure. Mobility and safety are often the binding constraints on women’s work.

What would workSix levers

Six things that would move the curve.

01
Match skilling to hiring, not certification targets
PMKVY placement has lagged far behind certification counts, and placement tracking itself has been weak. Tying payments to training partners to verified hiring, not enrolment, is the obvious fix. Sector skill councils with hiring accountability are the next step.
02
Double down on labour-intensive manufacturing
PLI schemes have worked best in capital-intensive sectors (electronics, pharma, auto). The 2025-26 Budget’s National Manufacturing Mission and the footwear / textiles / toy focus-product schemes are the next wave. Labour-intensive sectors create far more jobs per rupee of investment than electronics or pharma.
03
Formalise the gig economy, seriously
The Code on Social Security, in force since November 2025, recognises gig and platform workers, and states such as Rajasthan and Karnataka have passed their own gig-worker laws. A meaningful portable-benefits structure, health insurance, accident cover, and retirement contribution, is the labour reform most relevant to most young Indians.
04
Scale apprenticeships dramatically
NAPS has grown but remains a fraction of its potential. Germany, with about a seventeenth of India’s population, has some 1.2 million people in dual training at any time. Mandatory apprenticeship requirements for firms above a size threshold, combined with employer tax credits, would multiply absorption.
05
Close the female-workforce gap
FLFPR at ~42% is the biggest arithmetic lever available on total employment. Addressed in detail in Chapter 07, but worth flagging: if more of women’s work moved from unpaid or subsistence activity into paid jobs, the effect on output would exceed almost any other single reform.
06
Build a credible internship pipeline
The Budget 2024 internship scheme (1 crore interns with top 500 firms over five years) is the most ambitious such announcement India has made. Execution quality, real work, not make-work, will determine whether it becomes the bridge it aspires to be.
On the numbers

Labour-market data in India primarily comes from the Periodic Labour Force Survey (PLFS, ongoing since 2017) replacing the older NSSO Employment-Unemployment rounds. Independent estimates from CMIE, ILO, and academic researchers often vary; each methodology has its own strengths.

PLFS reports both usual status (a one-year reference period) and current weekly status (seven days); both count subsistence and unpaid family work as employment. CMIE uses a different method. Treat all employment and unemployment figures as directional; the relative patterns (age, education, gender) are more robust than the absolute levels.

The most recent Census of India is 2011; labour-force totals extrapolate from that baseline. Census 2027 will revise many of these estimates.

Sources & further reading

Primary data: PLFS 2023-24 (MoSPI); ILO India Employment Report 2024; e-Shram portal; CMIE Consumer Pyramids.

Research: Santosh Mehrotra (JNU); Ashwini Deshpande (Ashoka); Jean Drèze on rural labour; Radhicka Kapoor (ICRIER); Amit Basole (Azim Premji University).

Policy: Ministry of Labour & Employment; Labour Codes 2019-20 (in force from 21 November 2025); PLI scheme documentation; Budget 2024-25 and 2025-26 employment provisions.

Part 04Services · Human capital

Enrolled,
but learning?

India has achieved near-universal school enrolment. In rural India, 98.1% of children aged 6-14 were enrolled in 2024, up from about 96.7% in 2014 (ASER). The scaffolding has matured: NEP 2020, NIPUN Bharat, Samagra Shiksha, PM Shri. The gap that remains is the one between enrolment and learning. Fewer than half of rural Class 5 students (48.7%) can read a Class 2 text. That is the problem the next decade has to solve.

Picture a nine-year-old in Class 5 in rural Bihar. She sits in a government school, attends most days, has a textbook, has a teacher. By almost every statistical measure, Indian education has reached her: she is enrolled, she is not dropping out, she receives a midday meal, she is counted in the system.

Hand her a Class 2 Hindi storybook and ask her to read aloud. According to the 2024 Annual Status of Education Report, a Class 5 child in rural Bihar has a somewhat less than one-in-two chance (43.6%) of managing it. Ask her to do a simple division sum and the odds are lower still: nationally, only about three in ten rural Class 5 children can.

This is the central empirical fact of Indian education today. The access problem, how do we get children into schools, has been substantially solved. The learning problem, what happens once they are there, has not.

The access achievement is not small. The secondary-level dropout rate, about 17% in the mid-2010s, was 9.5% in 2025-26 (UDISE+). Girls’ gross enrolment now matches or exceeds boys’ at most school levels. PM POSHAN, the school meal scheme, reaches about 11 crore children. Samagra Shiksha merged three earlier schemes in 2018. PM SHRI is upgrading more than 14,500 schools as model institutions.

Meghalaya
71.8%
Sikkim
68.2%
Himachal Pradesh
67.6%
Arunachal Pradesh
66.5%
Chhattisgarh
59.5%
Madhya Pradesh
52.3%
Rajasthan
50.9%
Andhra Pradesh
44.8%
Tamil Nadu
43.2%
All-India
41.7%
Kerala
40.8%
Maharashtra
40.1%
Uttar Pradesh
34.5%
Bihar
30.5%
Haryana
24.2%
Delhi
18.5%

Percentage of Class 5 children in rural India (all school types) who can read a Class 2-level text. Source: ASER 2024 (released January 2025), a household survey in rural districts; figures carry a survey range. Himachal and Kerala have long done well; Uttar Pradesh’s rise of about ten points since 2022 is one of the notable shifts, while several southern states sit below the national figure.

Global context

How much India spends on public education depends on the measure: the Economic Survey 2023-24 put combined Centre and state education budgets at 2.7% of GDP in 2023-24, while the education ministry reports public expenditure of 4.12% of GDP in 2021-22. The 1966 Kothari Commission recommended 6%, a target repeated in NEP 2020 and still unmet.

The Vietnam example is instructive: a lower-middle-income country whose students outscored many richer peers in the PISA rounds of 2012 and 2015. The lesson: spending isn’t destiny, but under-spending makes the structural problem harder.

What has been doneThe structural decade

The architecture, rebuilt.

The policy machinery for Indian education has changed more in the past few years than in the preceding decades. NEP 2020 reoriented the framework. NIPUN Bharat made foundational learning the stated first priority. Samagra Shiksha consolidated scheme delivery. PM Shri created a model-school network. The vocationalisation of the curriculum has begun. Enrolment has stayed near-universal. The challenge now is converting architecture to outcomes.

2010
Right to Education Act (passed 2009) comes into force on 1 April; Article 21A’s promise of free and compulsory education for ages 6-14 becomes a justiciable right.
2013-2018
Enrolment ratios climb steadily as RTE implementation matures. Dropout rates at secondary level begin a durable decline.
2017-18
The National Achievement Survey 2017 tests about 22 lakh children in Classes 3, 5 and 8, the government’s largest learning assessment until then. In 2018, Samagra Shiksha merges SSA, RMSA and teacher education into one scheme.
2020
National Education Policy 2020 launched, the first comprehensive education policy in 34 years. Frames foundational literacy and numeracy as the first national priority.
2021
NIPUN Bharat launched with a target of universal Foundational Literacy and Numeracy (FLN) by end of Class 3 by 2026-27. State-level implementation begins.
2022
PM SHRI approved (September): more than 14,500 schools to be upgraded as model institutions under NEP 2020.
2023
National Curriculum Framework for School Education released (August), with vocational exposure from Class 6. The National Credit Framework is notified the same year.
2025
ASER 2024 (released January): enrolment near-universal; foundational learning shows its strongest gains in years, recovering past pre-pandemic levels. In government schools, Class 3 children able to read at Class 2 level rose from 16.3% (2022) to 23.4% (2024). ASER credits much of this to the national push on foundational learning under NIPUN Bharat.
04 · The gapFour numbers

Enrolment vs learning.

~98%
Enrolment of rural children aged 6-14 in 2024 (98.1%). Near-universal, a durable achievement.
ASER 2024
~49%
Rural Class 5 students who can read a Class 2 text (48.7%, ASER 2024). At Class 3 in government schools the same skill rose from 16.3% (2022) to 23.4% (2024). The honest measure of progress and gap.
ASER 2024
2.7-4.1%of GDP
India’s public education spending, depending on the measure (Economic Survey for 2023-24; education ministry for 2021-22). Either way, below the Kothari Commission’s 6%.
Economic Survey 2023-24; Ministry of Education
14,500+schools
Being upgraded under PM SHRI as model institutions. The network is meant to show what the new policy looks like when it is fully implemented.
Ministry of Education
What worksFour cases

Four models.

Vietnam · 2000s-present

The PISA over-performer

Vietnam’s PISA performance is the most-cited developing-country education story. Despite a far lower income than OECD members, Vietnamese 15-year-olds scored above the OECD average in the 2012 and 2015 rounds. The ingredients: disciplined teacher training, intensive focus on foundational skills, and centralised curriculum quality with local implementation.

India · Pratham

The Teaching at the Right Level model

Pratham Education Foundation’s Teaching at the Right Level (TaRL) methodology, grouping children by learning level rather than age/grade, has been rigorously evaluated by J-PAL and others. Randomised evaluations across several Indian states found large gains in basic reading and arithmetic, including from short, intensive learning camps. Scaled through state-government partnerships, and adapted in Zambia, Côte d’Ivoire and elsewhere.

Finland · 1970s-present

Teacher professionalisation

Finland’s education outcomes are built on a structural commitment: every teacher holds a master’s degree, teaching is a prestigious profession with strong pay and autonomy, and curricula are locally adapted within national frameworks. The lesson: no education system exceeds the quality of its teachers. India’s challenge is more scale than Finland faces, but the principle holds.

India · Kerala model

Universal foundational achievement

Kerala’s Class 5 reading level of 66% (ASER 2024), well above the rural all-India 48.7%, reflects decades of sustained investment in primary education, female literacy, and accountability in government schools. The model is neither fast to replicate nor a matter of a single policy, it is a multi-generational commitment to basic education being the state’s first priority.

What would workSix structural levers

Six things that would close the gap.

01
Invest in the first three years
A child who cannot read by Class 3 rarely catches up, because everything after that is taught through reading. Foundational literacy and numeracy is the highest-leverage investment in Indian education. NIPUN Bharat is the right framework; funding discipline and teacher training at scale are the execution variables.
02
Reduce teacher administrative load
Primary teachers lose a large share of their working time to non-teaching tasks: meal coordination, census and election duty, data entry and forms. Systematic relief here would improve instruction more than any curriculum change.
03
Fund education toward 6% of GDP
The 6% of GDP target is six decades old. Moving meaningfully toward it is a fiscal choice. The glide path over the next several budgets, at the Centre and in states, is what matters.
04
Treat vernacular publishing as infrastructure
India’s foundational reading deficit partly reflects the thinness of age-appropriate vernacular books. Pratham, NBT, state textbook boards, and private publishers have made progress; the scale-up should be a policy priority.
05
Measure, publish, and iterate
ASER is one NGO’s work. The National Achievement Survey is the government equivalent. Both should be regular, public, district-level, and acted upon. The 2024 PARAKH Rashtriya Sarvekshan, which replaced NAS, is a step in that direction.
06
Invest in teacher capacity, not just pay
Teacher appointments have scaled; continuous professional development has lagged. The NISHTHA programme (for 42 lakh teachers) is the scaffolding. Linking teacher training to what changes in classrooms, rather than to hours logged, is the next phase.
“The destiny of India is now being shaped in her classrooms.”
Education Commission (Kothari Commission)
Report of the Education Commission, 1964-66, opening line
On the numbers

India’s education data comes from multiple sources with slightly different methodologies: UDISE+ (administrative data, universal coverage), ASER (household survey, volunteer-administered), National Achievement Survey (sample assessment). Each has strengths and gaps.

ASER 2024 is a household survey of rural learning outcomes. Enrolment figures from UDISE+ are near-complete; learning-outcome figures are survey-based and carry inherent sampling uncertainty.

The delayed Census (last comprehensive in 2011) affects some extrapolations of school-age population totals. Treat specific figures as directional indicators of the pattern rather than point estimates.

Sources & further reading

Primary data: ASER Centre (Pratham); AISHE, All India Survey on Higher Education; UDISE+ data; NCERT National Achievement Survey; Economic Survey 2024-25 education chapter.

Research: Rukmini Banerji (Pratham); Karthik Muralidharan (UC San Diego); Wilima Wadhwa (ASER); Abhijit Banerjee and Esther Duflo on remedial learning (J-PAL).

Policy: Ministry of Education; NEP 2020; NIPUN Bharat guidelines; Samagra Shiksha framework; PM Shri scheme documentation.

Part 05Services · Human welfare

Sick, and
paying for it.

Out-of-pocket health spending in India fell from 64% of total health expenditure in 2013-14 to 43% in 2022-23. Few large emerging economies have cut the household share this fast. PM-JAY, among the world’s largest government-funded health insurance schemes, now covers more than 60 crore people by the government’s count. About 1.8 lakh Ayushman Arogya Mandirs offer primary care. Over 18,000 Jan Aushadhi stores sell generic medicines at a fraction of branded prices. The scaffolding has changed. The gaps remain large.

For most of Indian history, catastrophic illness in a poor household meant economic ruin. One widely cited estimate (Selvaraj, Farooqui and Karan, 2018) put the number of Indians pushed below the poverty line by health spending at about 5.5 crore in a single year, 2011-12. This was not a rare outcome; it was the baseline condition of the Indian health system.

That baseline has been shifting, and at pace. Out-of-pocket expenditure (OOPE), the share of health spending that households bear directly, fell from ~64% in 2013-14 to 39.4% in 2021-22, and stood at 43.4% in 2022-23, the latest National Health Accounts round. Households now carry a much smaller share of the national health bill than they did a decade ago.

Several programmes have contributed simultaneously. Pradhan Mantri Jan Arogya Yojana (PM-JAY), launched 2018, provides cashless in-patient cover up to ₹5 lakh per family per year with coverage of more than 60 crore people claimed by 2026 after the 2024 extension to everyone over 70. Ayushman Arogya Mandirs (formerly Health & Wellness Centres), of which about 1.8 lakh are now operational, have expanded primary care well beyond the historical reach of the public system. Jan Aushadhi stores, more than 18,000 of them by September 2026 against a target of 25,000 by March 2027, offer generic medicines at a fraction of branded prices. None of these eliminates the Indian health challenge; all of them meaningfully narrow it.

2013-14
64.2%
2015-16
60.6%
2017-18
48.8%
2018-19
48.2%
2019-20
47.1%
2020-21
44.4%
2021-22
39.4%
2022-23
43.4%

Out-of-pocket expenditure as % of total health expenditure, India. Source: National Health Accounts (NHA) estimates, Ministry of Health & Family Welfare. The 2022-23 round was released in May 2026. The fall from 64.2% to 43.4% over nine years is the steepest in the NHA series, though the share rose again from its 2021-22 low of 39.4%.

Global context

Out-of-pocket spending as % of current health expenditure, 2023 (WHO Global Health Expenditure Database): Thailand ~10%, United Kingdom ~15% (2024), Brazil ~26%, Indonesia ~31%, China ~32%, India ~44%, Pakistan ~53%, Bangladesh ~79%. India has closed much of the gap with middle-income peers, though it remains well above China and Indonesia.

The peer example Indian policymakers watch is Thailand’s 2001 Universal Coverage Scheme, during which the out-of-pocket share fell from about 34% in 2000 to about 14% in 2010 (WHO). The Thai model combines tax-financed universal coverage with a fixed capitation payment to providers, no co-payments, and tight cost controls. PM-JAY shares some features and differs in others (eligibility, financing mix). The trajectory is possible.

What has been builtThe universal-coverage decade

Architecture, assembled.

Over the past decade, India has built much of the scaffolding of a universal-coverage health system. PM-JAY for catastrophic care. Ayushman Arogya Mandirs for primary care. Jan Aushadhi for affordable medicine. Ayushman Bharat Digital Mission for records. The mix is imperfect, varies by state, and leaves real gaps, but it is meaningfully different from what existed in 2012.

2005
National Rural Health Mission launched, the structural foundation of public primary care in rural India, later integrated into the National Health Mission.
2013-14
The first official National Health Accounts round puts OOPE at 64.2%: nearly two-thirds of every rupee spent on health is paid directly by households.
2017
National Health Policy 2017 sets the target of government health spending reaching 2.5% of GDP. Recommits to key coverage indicators.
2018
Pradhan Mantri Jan Arogya Yojana (PM-JAY) launched, flagship government-funded insurance, coverage up to ₹5 lakh per family per year. Among the largest such programmes in the world by people covered.
2018
Ayushman Bharat Health & Wellness Centres (now Ayushman Arogya Mandirs) begin rollout as the primary-care backbone of the AB programme.
2020
Covid-19 exposes both fragility and resilience: the 2021 second wave overwhelms hospitals, but CoWIN and domestic vaccine makers deliver at very large scale. Over 220 crore doses administered by mid-2022.
2021
Ayushman Bharat Digital Mission launched, the digital rails for a longitudinal health records system. It could become India’s next DPI success; governance is the open question.
2023-26
Jan Aushadhi network grows from about 10,000 stores to more than 18,000 by September 2026; the target is 25,000 by March 2027.
2024-25
Ayushman Arogya Mandirs cross 1.7 lakh. October 2024: the Ayushman Vay Vandana card extends PM-JAY to everyone aged 70 and above regardless of income, with a separate ₹5 lakh top-up for those in already-covered families. By September 2026, the government reports more than 48 crore Ayushman cards, about 38,000 empanelled hospitals and roughly 13 crore people treated over eight years.
2026
NHA 2022-23, released in May 2026, puts out-of-pocket spending at 43.4% of total health expenditure, up from 39.4% in 2021-22 but still far below the 64.2% of 2013-14.
05 · ProgressFour numbers

The improvement, quantified.

~43%OOPE
Out-of-pocket spending as % of total health expenditure in 2022-23 (43.4%), down from 64.2% in 2013-14.
National Health Accounts 2022-23
60 cr+covered
People with PM-JAY cover by the government’s count in September 2026, after the 2024 extension to all seniors aged 70+. More than 48 crore Ayushman cards issued; about 38,000 hospitals empanelled.
Ministry of Health & Family Welfare, September 2026
~1.8 lakhcentres
Ayushman Arogya Mandirs operational, extending primary care well beyond the old reach of the rural health system. The government reports over 500 crore visits.
National Health Mission, 2026
1.48%of GDP
Government health expenditure in 2022-23, well below the NHP 2017 target of 2.5% by 2025. Households paid almost as much (1.47% of GDP) out of pocket.
National Health Accounts 2022-23
What worksFour cases

Four models.

Thailand · 2001-present

Universal coverage done well

Thailand’s 2001 Universal Coverage Scheme helped cut the out-of-pocket share from about 34% in 2000 to about 14% by 2010, and to about 10% by 2023 (WHO). Tax-financed, no co-payments at the point of care, capitation payments to providers, tight cost controls. Thailand did this while spending a modest share of GDP on health, an efficiency India should study closely.

Rwanda · 1999-present

Community-based health insurance at scale

Rwanda’s Mutuelles de Santé community-based insurance covers the large majority of the population, and households pay a very small share of health costs directly (about 4% in 2023, WHO). Under-five mortality has fallen by more than three-quarters since the late 1990s. A small country, but an instructive case in coverage-expansion under resource constraints.

India · Covid response

CoWIN and the vaccine build-out

India administered over 220 crore Covid vaccine doses by mid-2022, one of the largest vaccination drives ever run. CoWIN has since been offered to other countries as digital public infrastructure. The case demonstrates that the Indian state can execute at extraordinary scale when the political and financial commitment align.

India · Tamil Nadu model

Public health infrastructure as state priority

Tamil Nadu has for decades invested more per capita in public health than most Indian states. Result: infant mortality of 12 per 1,000 live births against 25 nationally (SRS 2023); institutional delivery of about 99% (NFHS-5); and an out-of-pocket share below the national figure (NHA 2022-23). Kerala has even lower infant mortality (5), though its households still pay a high share out of pocket. The conclusion: sustained state-level commitment compounds.

What would workSix levers

Six things that would complete the transition.

01
Raise government health spending toward 2.5% GDP
The National Health Policy 2017 target. Glide path has been slow; moving from about 1.5% to 2.5% over several budgets would compound the improvements already made. At current GDP, every 0.1 percentage point is roughly ₹35,000-40,000 crore.
02
Fund public primary care at scale
Ayushman Arogya Mandirs have expanded access, the next question is staffing, medicine supply, and referral pathways. Filling these gaps is cheaper than any additional hospital build.
03
Solve the doctor-distribution problem
India now has over 1.1 lakh MBBS seats a year, roughly double the number a decade ago. Supply is no longer the only constraint; where doctors work is. Rural posting incentives, structured DNB/fellowship programmes, and telemedicine integration are where the system still under-performs.
04
Scale Ayushman Bharat Digital Mission, carefully
ABDM is the potential next DPI success. Privacy architecture, inclusion safeguards, and interoperability standards are the governance questions that will determine whether it lands well. Data protection under the DPDP Act is the legal hinge.
05
Address NCDs and mental health explicitly
Non-communicable diseases (heart disease, diabetes, cancer, chronic respiratory disease) now account for more than half of India’s disease burden and about six in ten deaths (India State-Level Disease Burden Initiative). Mental health, despite improved recognition, remains dramatically under-resourced. Both need explicit budget lines beyond current allocations.
06
Strengthen state-level public health systems
Tamil Nadu and Kerala have demonstrated what sustained state-level investment produces. Fiscal transfers that reward states for raising health spending would help. States with the weakest outcomes, such as Bihar and Uttar Pradesh, also have the largest absolute gaps.
On the numbers

India’s health-expenditure data comes from the National Health Accounts (NHA), produced by the National Health Systems Resource Centre. The 2022-23 round, released in May 2026, is the most recent comprehensive estimate. Previous rounds use comparable but not identical methodology.

PM-JAY coverage figures are the government’s and vary across sources: about 55 crore at launch-era eligibility, and more than 60 crore claimed by 2026 after the extension to all seniors aged 70+. Cover is not the same as use.

The most recent Census is 2011; household-level estimates of health-expenditure burden rely on NSSO rounds and NFHS, each with their own sampling frame. Treat all such figures as directional.

Sources & further reading

Primary data: National Health Accounts 2022-23; NFHS-5 (2019-21); National Health Authority (PM-JAY dashboard); Ayushman Bharat Digital Mission portal.

Research: Public Health Foundation of India; K. Srinath Reddy’s health systems analyses; Lancet Countdown India; Observer Research Foundation health team.

Global reference: WHO Global Health Expenditure Database; Thailand Universal Coverage Scheme evaluations; Rwanda Ministry of Health reports.

Part 06Environment · Climate

The heat
is on.

2024 was India’s hottest year since records began in 1901. The government told Parliament that 554 heatwave days were observed that year, against 230 in 2023. More than 40,000 suspected heatstroke cases were reported in the summer. And yet: Ahmedabad built South Asia’s first Heat Action Plan in 2013, and the government now reports plans in over 250 cities and districts across 23 heat-prone states. The climate frontline has arrived. The response has begun.

Churu, Rajasthan, 28 May 2024. The mercury hits 50.5°C. Across May and June that year, much of North India runs above 45°C for days on end. Construction workers collapse. Polling staff die on election duty. In June, Delhi’s Safdarjung station records a night that never cools below 35.2°C.

2024 was, officially, India’s warmest year since the India Meteorological Department’s national record begins in 1901, about 0.65°C above the 1991-2020 average. Most of the warmest years in that record have come since 2009.

What is different about heat, as a climate story, is that it is immediate. Air pollution’s toll is modelled. Groundwater depletion is slow. Heat is the child who cannot concentrate in an unventilated classroom; the vegetable vendor whose stock perishes by noon; the delivery worker whose phone screen shuts off.

India’s response has been early for a developing economy. Ahmedabad’s 2013 Heat Action Plan was the first in South Asia; a 2018 evaluation in the Journal of Environmental and Public Health (Hess and others) estimated about 1,190 deaths a year avoided after it began. The government now counts plans in over 250 cities and districts, though many remain documents on paper. In August 2026 the government told Parliament that heatwaves and lightning had been recognised as natural calamities, following the 16th Finance Commission’s recommendation, so state and national disaster response funds can now be used for heat relief.

2023
230days
2024
554days

Heatwave days observed over the Indian region. Source: Ministry of Earth Sciences reply in Parliament, 5 December 2024. The 2024 count was more than double 2023’s.

Global context

India sits among the world’s most heat-exposed large economies, and no other country has as many people exposed. The World Bank (2022) estimates that about 75% of India’s workforce, some 38 crore people, depends on heat-exposed labour.

The comparison frame is not the US or Europe. It is Pakistan, Bangladesh, Nigeria, Egypt. Miami-Dade, Athens, Freetown, Santiago and Dhaka North have appointed Chief Heat Officers; few if any Indian cities have created an equivalent permanent post.

What has been doneThe adaptation decade

Heat Action, institutionalised.

India’s response to heat is a clear example of adaptive policy in a developing country. Heat Action Plans spread from one city in 2013 to over 250 cities and districts by the government’s 2026 count. Recognising heatwaves as a calamity in 2026 opened disaster-fund money for heat relief. None of this makes India heat-safe; all of it makes India measurably more heat-prepared than it was a decade ago.

2010
Ahmedabad heatwave in May; a later study (Azhar and others, 2014) estimates about 1,300 excess deaths, pushing the city towards preventive planning.
2013
Ahmedabad Heat Action Plan launched, first in South Asia. Colour-coded alerts, training of health workers, public communication.
2016
NDMA publishes national guidelines for heatwave action plans (revised in 2017 and 2019), encouraging states to prepare city and district plans.
2018
An evaluation in the Journal of Environmental and Public Health estimates about 1,190 deaths a year avoided in Ahmedabad after the plan.
2023
A Centre for Policy Research review of 37 heat action plans finds most lack local risk assessment, dedicated funding and legal backing.
2023
Telangana Cool Roof Policy 2023-28 (April), the first state cool-roof policy: mandatory for government, commercial and larger residential buildings, with a target of 300 sq km of cool roofs by 2028.
2024
India’s warmest year since 1901, with 554 heatwave days.
2025
CEEW’s district heat-risk assessment finds 417 of 734 districts (57%) at high or very high risk.
2026
Heatwaves and lightning recognised as natural calamities (told to Parliament in August), after the 16th Finance Commission’s recommendation, so disaster response funds can cover heat relief.
06 · The tollFour numbers

The climate frontline, arrived.

554days
Heatwave days observed over India in 2024, against 230 in 2023. 2024 was India’s warmest year since 1901.
Ministry of Earth Sciences, Parliament reply, December 2024
~730deaths
Heat deaths in 2024 counted by HeatWatch from media reports across 17 states. The health ministry’s count was 360. Heat mortality is systematically undercounted; figures vary widely.
HeatWatch, Struck by Heat (2024); Ministry of Health
~57%districts
Of 734 districts (417) classified at high or very high heat risk.
CEEW, How Extreme Heat is Impacting India (2025)
250+cities & districts
With Heat Action Plans across 23 heat-prone states, by the government’s count. Many are still guidance documents rather than funded programmes.
Government of India, 2026
What worksFour cases

Four case studies.

India · Ahmedabad 2013

The first HAP in South Asia

Designed by the Indian Institute of Public Health with NRDC and the city administration. Colour-coded alerts, text-message warnings, training for health workers, cooling spaces and drinking water points. A 2018 evaluation estimated about 1,190 deaths a year avoided. It became the template for plans across India.

Global · Chief Heat Officer

The accountability model

Miami-Dade County (2021) appointed the world’s first Chief Heat Officer. Athens, Freetown, Santiago and Dhaka North followed. A single accountable official with budget and targets for city-wide heat resilience. Few if any Indian cities have created such a post; institutionalising this role would replace goodwill with structure.

India · Telangana 2023-28

Cool Roofs at scale

The first state cool-roof policy in India, mandatory for government, commercial and larger residential buildings. Cool roofs can cut indoor air temperatures by about 2-4°C, by the policy’s own estimate. The target is 300 sq km of cool roofs by 2028. Replication across other states would be among the cheapest public-health interventions available.

Europe · post-2003

Heat warning systems

After the 2003 European heatwave killed more than 70,000 people, France, Spain, Italy and others built national heat-warning systems. The risk of dying at a given temperature has fallen, but heat still killed over 60,000 people in Europe in the summer of 2022 (Nature Medicine, 2023). Warning systems are necessary, not sufficient.

What would workSix levers

Six things that would save lives.

01
Count the dead honestly
The gap between the official (360) and independent (733) heat-death counts for 2024 is not a rounding error. Better recording, tied to hospital admission data rather than post-hoc reclassification, builds the political pressure scale-up requires.
02
Appoint permanent city Heat Officers
Miami-Dade, Athens, Freetown and Santiago have them. Indian cities need the same. A dedicated officer with budget and KPIs would institutionalise what currently depends on individual HAP coordinators’ goodwill.
03
Fund cool roofs at scale
A low-cost coating for a 2-4°C indoor reduction. Telangana 2023-28 is the first state-level commitment. National replication would be among the cheapest public-health interventions available.
04
Protect outdoor workers
About 75% of India’s workforce depends on heat-exposed labour (World Bank, 2022). States issue seasonal advisories to shift outdoor work away from midday, as Kerala’s labour department does each summer. Binding, enforced rest-hour rules would go further.
05
Integrate heat into urban planning
Tree cover, building orientation, water bodies, shading, ventilation corridors are health infrastructure, not decoration. Every urban master plan approved now is a 20-to-30-year commitment. Heat resilience at that stage is cheaper than retrofitting.
06
Strengthen long-range seasonal forecasting
IMD’s short-range heat warnings have improved, and it already issues extended-range outlooks up to four weeks ahead. Turning those outlooks into district-level triggers for hospitals, schools and employers would let them prepare in advance rather than react.
On the numbers

India’s heat mortality is systematically undercounted. The government toll is based on state-level reporting; independent counts compiled from media reports and hospital data arrive at higher figures. The real number is almost certainly higher than the official one.

Temperature and heatwave data from IMD use specific definitions that differ slightly from peer services abroad; comparisons across countries require care.

HAP counts include formal plans notified by city and district administrations; quality and implementation vary. The 250+ figure is a count of plans, not necessarily of functioning ones.

Sources & further reading

Primary data: IMD Annual Climate Summary 2024; CEEW heat risk assessment 2025; HeatWatch Struck by Heat Report 2024.

Research: Hess et al., Journal of Environmental and Public Health 2018 (Ahmedabad HAP evaluation); Azhar et al., PLOS ONE 2014 (2010 Ahmedabad heatwave); Centre for Policy Research HAP review (2023); World Bank, Climate Investment Opportunities in India’s Cooling Sector (2022).

Part 07Social · Workforce

Half the
workforce?

India’s female labour force participation rate rose from 24.5% in 2018-19 to 41.7% in 2023-24, one of the sharpest rises in the survey record. Much of it is women working on family farms or as unpaid helpers in household enterprises, which the survey counts as employment; urban participation has risen far less. The Women’s Reservation Act passed in 2023 after 27 years of deferred debate. Measurable progress has been made. The gap with peer economies remains. Both are true.

India has about 70 crore women. In 2018-19, about one in four women aged 15 and above was in the labour force. In 2023-24, it was about two in five. By a rough calculation from PLFS rates and population estimates, that is around 10 crore more women in the labour force in five years. Few shifts in the composition of the Indian workforce have been this large.

The caveats are real. Much of the increase is concentrated in rural self-employment, own-account agricultural work, animal husbandry, home-based enterprises. Urban FLFPR has risen more modestly. The Indian woman who is visibly in the labour market, the female-headed household, the returning migrant, the gig worker, the shopfloor operator, remains underrepresented relative to Vietnam or Indonesia.

But the direction is clear. The 106th Constitutional Amendment was passed in 2023 and brought into force from 16 April 2026, reserving one-third of Lok Sabha and state assembly seats for women, the first major structural reform after 27 years of attempts. Implementation is still tied to delimitation after the next Census (2029 at the earliest); the 131st Amendment to delink failed in Parliament on 17 April 2026. The reform is law; the implementation is the unresolved question.

Himachal Pradesh
64.8%
Sikkim
57.1%
Andhra Pradesh
52.3%
Telangana
48.9%
Karnataka
47.1%
Tamil Nadu
45.8%
All-India
41.7%
Kerala
40.6%
Maharashtra
38.2%
West Bengal
32.4%
Uttar Pradesh
31.8%
Delhi (NCT)
23.1%
Bihar
21.5%

Female Labour Force Participation Rate, age 15+, usual status, PLFS 2023-24 (Table 16). Meghalaya, Sikkim and Himachal top the table, reflecting large shares of rural women in family farming. The pattern in Delhi and Bihar is low participation, not low work, Indian women work extensively; much of it is unpaid and unrecorded.

Global context

Female labour force participation, ILO modelled estimates for 2025: Vietnam ~69%, China ~59%, Rwanda ~57%, United States ~56%, Indonesia ~54%, Brazil ~53%, Bangladesh ~39%, India ~32%, Pakistan ~24%. The ILO’s India figure is lower than PLFS’s 41.7% because of different definitions; on either measure, Vietnam and China remain well ahead.

The Vietnamese and Bangladeshi cases are the most structurally comparable. Both absorbed large rural female workforces into formal manufacturing (garments in Bangladesh; electronics, garments, agro-processing in Vietnam). India’s next rise in women’s paid work is likely to need the same pattern; PLI, the National Manufacturing Mission and labour-intensive sector schemes are the instruments on hand.

What has been doneThe workforce decade

Millions of women, returning.

The Indian women’s-workforce story is one of the clearest cases of rapid change in the past decade of labour-market data. From 24.5% FLFPR in 2018-19 to 41.7% in 2023-24. From about 8% of Lok Sabha MPs being women in 2004 to about 14% in 2024, with 33% reservation now in law. From mandatory maternity leave of 12 weeks to 26. None of this makes India gender-equal; all of it makes India measurably more gender-inclusive than it was a decade ago.

2005
Mahatma Gandhi National Rural Employment Guarantee Act. Over the following years it becomes one of the largest employers of rural women anywhere; women account for more than half of workdays.
2013
Sexual Harassment of Women at Workplace Act. Creates Internal Complaints Committees framework.
2017
Maternity Benefit (Amendment) Act extends paid maternity leave from 12 to 26 weeks for women in covered establishments.
2017-18
The first PLFS puts FLFPR at 23.3%, the low point of the series, after years of decline in rural women’s work through the early 2010s.
2021-23
Steep rise in FLFPR, led by rural self-employment and unpaid work in family enterprises; researchers debate how much reflects distress after the pandemic and how much new opportunity.
2022
Palna, the revamped national crèche scheme under Mission Shakti, begins setting up Anganwadi-cum-Crèches; 17,000 are envisaged.
2023
Nari Shakti Vandan Adhiniyam (106th Constitutional Amendment), 33% reservation for women in Lok Sabha and state assemblies. First major structural reform after 27 years of attempts.
2023
Karnataka’s Shakti scheme (June) and Telangana’s Mahalakshmi scheme (December) make state bus travel free for women, following Delhi (2019) and Tamil Nadu (2021).
2023-24
FLFPR rises to 41.7% per PLFS. The 2025 calendar-year round puts it at 40.0%.
2026
131st Amendment to delink Women’s Reservation from delimitation fails in Parliament on 17 April 2026. Implementation still awaits delimitation after the next Census, 2029 at the earliest.
07 · The shiftFour numbers

The missing half, returning.

~42%FLFPR
Female Labour Force Participation Rate, 2023-24 (41.7%), up from 24.5% in 2018-19. By a rough calculation, around 10 crore more women in the labour force.
PLFS 2023-24
131of 148
India’s rank on the WEF Global Gender Gap Index 2026, unchanged from 2025. Political empowerment and economic participation are the weakest sub-indices.
WEF Global Gender Gap Report 2026
33%reserved
Women’s reservation in Lok Sabha and state assemblies, enacted 2023, in force from April 2026. First major structural reform after 27 years of attempts.
106th Amendment Act, 2023 / 2026
~7hours/day
Time women who do such work spend each day on unpaid domestic chores (289 minutes) and caregiving (137 minutes), against under 3 hours for men (88 and 75 minutes). The care economy is economic infrastructure.
MoSPI Time Use Survey 2024
What worksFour cases

Four models.

Rwanda · 2003-present

The gender-quota maximalist

Rwanda has the world’s highest share of women in a lower house: 51 of 80 seats (63.75%) after the 2024 election. Its constitution requires at least 30%; parties and elected councils have gone well beyond it. A quota sets a floor; politics decides how far above it a country goes.

Bangladesh · 1990s-present

Manufacturing-driven FLFPR

Bangladesh’s garment industry employs around 4 million workers, a majority of them women. Female labour force participation rose from about 25% in 1991 to around 39% in 2024 on ILO estimates, with garments as the main urban on-ramp. The lesson for India: labour-intensive manufacturing is the historic on-ramp for women’s workforce participation at scale.

India · Free bus travel

Transport as labour infrastructure

Karnataka’s Shakti scheme (June 2023), like earlier schemes in Delhi and Tamil Nadu, made state bus travel free for women. Its effect on paid work is still being studied, and the evidence so far is mixed. Mobility, safety and transit access are often the binding constraints on women’s workforce participation.

India · MGNREGA / VB-G RAM G

Women’s workdays at scale

Women accounted for more than half of MGNREGA workdays nationally in recent years. For a significant share of rural women, this rural employment guarantee was their only direct monetary income. Whether the December 2025 switch to VB-G RAM G (125 days, but with states paying 40% in most cases) preserves this share is the open question.

What would workSix levers

Six things that would close the gap.

01
Treat the care economy as economic infrastructure
Women who do unpaid care work spend about 7 hours a day on it, against under 3 for men (Time Use Survey 2024). Anganwadi-cum-Crèches are the lever: 14,599 had been approved by mid-2025, but only a fraction were running. Each working crèche frees hours for paid work.
02
Enforce POSH, seriously
The 2013 Act exists. Compliance, particularly ICC constitution, is patchy. Tying POSH compliance to stock-exchange listing disclosure and government-contract eligibility would shift corporate behaviour.
03
Accelerate Women’s Reservation implementation
The 33% quota has been law since 2023, but it cannot apply before delimitation. Every year of delay is a year of lost representation. Bringing implementation forward, and considering Rajya Sabha extension, would be the clearest next signal.
04
Mandate pay-gap transparency
Studies of the UK’s 2017 reporting rule find it narrowed the gap modestly at reporting firms, mainly by slowing men’s pay growth. India has no equivalent disclosure; adding it would be low-cost, high-signal.
05
Build safety as labour infrastructure
Safety and transport shape which jobs women can take. Street lighting, reliable transit, functional CCTV, safety audits are unglamorous basics that work.
06
Invest in skilling for formal manufacturing
Bangladesh’s garment workforce, Vietnam’s electronics workforce: both built through sustained skilling for formal women’s employment. The PLI and National Manufacturing Mission architecture is the right moment to link labour-intensive manufacturing directly to women’s skilling and hiring targets.
“I measure the progress of a community by the degree of progress which women have achieved.”
Dr B.R. Ambedkar
On the numbers

FLFPR is from PLFS, replacing older NSSO rounds. Methodology shifts mean precise comparisons with pre-2017 figures require care, but the direction (24.5% in 2018-19 to 41.7% in 2023-24) is robust. A large part of the rise is women counted as unpaid helpers in household enterprises or as own-account workers on family farms; the urban figure has risen far less. Both are signal: women are doing more recorded economic work, and urban formal jobs for women remain scarce.

India’s sex ratio at birth, per NFHS-5 (2019-21), is 929 females per 1,000 males, an improvement from 919 in NFHS-4, but still well below the natural figure of around 952. Son preference is weaker than it was a generation ago; it has not been eliminated. Northern states (Haryana, Punjab) continue to lag the southern (Kerala, Tamil Nadu) by margins that have proved durable across surveys.

Much of the recent FLFPR rise is in rural self-employment. Urban FLFPR has risen more modestly. Informal work is harder to measure; treat specific state-level figures as directional.

The most recent Census is 2011; population totals extrapolate from that baseline.

Sources & further reading

Primary data: PLFS 2023-24 (MoSPI); WEF Global Gender Gap Report 2026; MoSPI Time Use Survey 2024; NCRB Crime in India (latest edition).

Research: Ashwini Deshpande (Ashoka); IWWAGE; Esther Duflo on panchayat reservations; Rohini Pande on representation.

Part 08Livelihood · Rural economy

The farm
question.

Indian agriculture employs about 46% of the workforce (PLFS 2023-24) and produces roughly a sixth of gross value added. The gap between who works in agriculture and what agriculture pays is the deepest structural fault line in the economy. The past decade has brought record foodgrain production (357.73 million tonnes in 2024-25), direct income transfer at scale (PM-Kisan had paid out over ₹4.4 lakh crore across 24 instalments by October 2026; the AgriStack Farmer ID is the next layer of infrastructure), and 10,000 new Farmer Producer Organisations. The scaffolding is more serious than before. The underlying structural question persists.

The Indian farmer exists in the political imagination as a single figure: a small landholder, at the mercy of the monsoon. The reality is more varied. The Indian farmer is also a tenant cultivator invisible to most government schemes; a landless labourer whose household runs on MGNREGA wages; a member of a Farmer Producer Organisation negotiating contract supply; a drip adopter who exits paddy for horticulture.

The Agricultural Census of 2015-16, the most recent complete count, recorded 146.45 million operational holdings at an average size of 1.08 hectares. Fieldwork for the 2021-22 Census was completed by mid-2026, but results are not yet out; 2015-16 remains the baseline. About 86% of operational holdings are under 2 hectares.

Marginal (<1 ha)
68.45%
Small (1-2 ha)
17.62%
Semi-medium (2-4 ha)
9.55%
Medium (4-10 ha)
3.8%
Large (>10 ha)
0.57%

Share of operational holdings by size class. Source: Agricultural Census 2015-16 (latest available). Fragmentation through inheritance has compressed holdings to a point where modern investment, tubewells, tractors, cold chains, is economically unviable for most single operators.

Global context

India’s agricultural sector employs about 46% of the workforce but produces roughly a sixth of output. In peer economies, far fewer people remain on farms: China (about 22% of workers), Vietnam (under 30%), Brazil (under 10%), the US (under 2%), on World Bank and ILO estimates. The transition China, Vietnam, and earlier Japan managed, moving rural labour into formal manufacturing, is the structural shift India is still completing.

What has been builtThe farmer-welfare decade

Serious scaffolding, assembled.

The policy machinery for Indian agriculture has expanded a great deal over the past decade. Not all of it has worked well. Some of it has worked better than expected. Together it is the largest farmer-welfare architecture India has assembled.

2004-05
The National Commission on Farmers (2004-06), chaired by M.S. Swaminathan, lays the groundwork for later farmer-welfare policy, including the demand for MSP at cost plus 50%.
2014-18
MSP is announced for 22 mandated crops, but procurement stays anchored on rice and wheat. In 2018 MSPs are set at least 50% above paid-out costs (A2+FL).
2016
PMFBY (Pradhan Mantri Fasal Bima Yojana) launched, among the largest crop insurance schemes in the world by farmer enrolment. Delays in claim payments remain a standing complaint.
2020
Agriculture Infrastructure Fund launched: a ₹1 lakh crore financing facility for cold chains, warehouses and processing units.
2019
PM-Kisan launched: ₹6,000 a year in three instalments, direct to farmers’ bank accounts. By October 2026, 24 instalments and over ₹4.4 lakh crore had been paid; about 9.3 crore farmer families received the 24th.
2020
10,000 FPO scheme announced; the 10,000th FPO was marked in February 2025. Viability, not formation, is now the test.
2022
Millets receive renewed attention ahead of 2023, the UN International Year of Millets proposed by India.
FY25
Record foodgrain production at 357.7 million tonnes, about 8% above 2023-24 and over 100 MT above 2015-16. Rice 150.18 MT, wheat 117.94 MT. India remains the world’s largest milk producer and one of the two largest producers of rice and wheat.
2025
Budget 2025-26 announces a six-year Mission for Aatmanirbharta in Pulses, with central agencies to procure tur, urad and masoor from registered farmers for four years.
08 · The arithmeticFour numbers

The rural arithmetic.

~86%
Of Indian farms are small or marginal, under 2 hectares (86.1%). The average holding was 1.08 hectares in 2015-16 and has been shrinking with each census as land is divided among heirs.
Agricultural Census 2015-16
~₹10,200/mo
Average monthly income of an agricultural household in 2018-19 (₹10,218). Crop cultivation supplied only about 37% of it; wages were the largest single source, at about 40%, with livestock most of the rest. Farming alone does not support most farming households.
NSO Situation Assessment Survey, 77th round (2019)
~10,000FPOs
Farmer Producer Organisations formed under the Centre’s 2020 scheme; the target was reached in February 2025. Many are still too small to bargain well.
Ministry of Agriculture, 2025
~358 Mtonnes
Record foodgrain production in 2024-25 (357.73 MT; rice 150.18 MT, wheat 117.94 MT), about 8% above the previous year. The production story, often missed in the distress narrative, is strong.
Ministry of Agriculture & Farmers Welfare, 2026
What worksFour cases

Four models.

Netherlands · post-1970

High-intensity, high-value agriculture

The Netherlands exports well over €100 billion of agricultural goods a year (including re-exports) from a country a third the size of Tamil Nadu, through glasshouse horticulture, intensive dairy, and value-added food processing. The lesson: agricultural prosperity is about value-add, not land area. Indian horticulture, now around 350 million tonnes a year, is the closest structural parallel.

Israel · 1965-present

Drip and water productivity

Israeli drip irrigation, commercialised by Netafim from 1965, typically uses much less water than flooding fields for similar yields. In India, micro-irrigation has grown but still covers only a small share of irrigated land. The biggest-lever intervention available, given the water chapter.

India · Anand model

Dairy cooperatives at scale

Operation Flood (1970-96) took India from milk-scarce to the world’s largest milk producer (by 1998) through Amul-style cooperatives. The FPO model for agriculture is a direct descendant of this blueprint. The institutional technology exists; replicating the Amul trajectory in other commodities is the challenge.

China · 1980s-present

Township-village enterprises

China moved hundreds of millions of people out of farming over three decades, many of them first into rural township and village enterprises close to home. The lesson: the farm problem is often solved not on the farm but at its edge, in food processing, logistics, agri-services. India’s Agriculture Infrastructure Fund targets the same layer.

What would workSix levers

Six things that would work.

01
Diversify MSP beyond rice and wheat
Most MSP procurement is of paddy and wheat, which locks Punjab, Haryana and western UP into water-intensive monoculture. Effective MSP with procurement for pulses, oilseeds, and millets is the single most consequential diversification lever. The 2023 millets push and Budget 2025-26’s pulses mission are early signals.
02
Recognise tenants and the landless
PM-Kisan conditions on land records; tenant farmers and landless labourers are partially excluded. Andhra Pradesh’s cultivator-rights cards for tenants (2011, revised 2019) and Odisha’s KALIA scheme, which offered landless households about ₹12,500 for livelihood activities, are the working templates. National extension would bring the most precarious population into the policy net.
03
Invest in post-harvest infrastructure
Post-harvest losses run from about 4-7% for cereals and pulses to as much as 15% for some fruits, worth roughly ₹1.5 lakh crore a year (NABCONS, 2022). Agriculture Infrastructure Fund projects have begun closing this gap; scale matters. Warehouse-receipt financing and cold-chain subsidies for FPO-owned infrastructure would multiply impact.
04
Fund agricultural R&D at peer-country levels
India spends well under half a percent of agricultural GDP on agricultural research; Brazil, home of EMBRAPA, spends several times that share. Climate-resilient seeds, water-efficient crops, and precision-agriculture platforms are the infrastructure of the next farm economy.
05
Scale FPOs beyond the initial 10,000
The 10,000 FPO target was met in 2025. The next phase is viability: access to working capital, market linkages, and commercial partnerships. SFAC, NABARD, and NCDC scaling of equity capital and operational support is the implementation test.
06
Build an exit ramp, not a moat
The most important agricultural policy is, paradoxically, a non-agricultural policy. Labour-intensive manufacturing, urban housing, reliable non-farm employment. Rural distress ends when rural labour has credible alternatives. This is why Chapter 03 (Jobs) and Chapter 15 (Growth) are the other sides of the farm-question coin.
On the numbers

Agricultural data in India comes from multiple sources: the Agricultural Census (2015-16 is the most recent published round; 2021-22 results are pending), NSSO Situation Assessment Surveys (2019 is most recent), Ministry of Agriculture administrative data, and NCRB for accidental deaths/suicides. Different sources produce slightly different figures.

The farmer-household-income figure of ~₹10,200/month (NSSO 2019) is the most recent authoritative household-level estimate. Cost of cultivation and net income vary dramatically by state, crop, and tenure status.

NCRB farmer-suicide data has been contested on methodology, and the classification changed in 2014. Since then the count of farmer and farm-labourer suicides has stayed at roughly 10,000-12,000 a year (10,786 in 2023). Treat all such figures as directional.

Sources & further reading

Primary data: Ministry of Agriculture & Farmers’ Welfare; NSSO 77th Round (2019); Agricultural Census 2015-16; NCRB Accidental Deaths & Suicides 2023.

Research: Ashok Gulati (ICRIER); Himanshu (JNU); P. Sainath; People’s Archive of Rural India; PRS Legislative Research; Mekhala Krishnamurthy on agricultural markets.

Global reference: Netherlands Ministry of Agriculture; Israel Ministry of Agriculture; NABCONS post-harvest loss study (2022); World Bank agricultural productivity reports.

Part 09Services · Urban future

The city is the
future.

About 600 million Indians are projected to live in towns and cities by 2036, roughly 39% of the population by official definition, up from 31% (377 million) in 2011. The official figure understates the truth: India’s administrative definition of “urban” (75%+ male non-farm workforce, 5,000+ population, 400/sq km density) excludes much of the country’s densely populated peri-urban belt; density-based methods used by the World Bank and the European Commission put the real urban share well above the official figure. Cities are commonly estimated to produce around two-thirds of GDP. Urban budget allocations have risen sharply over the decade, including a 17% rise in the Ministry of Housing and Urban Affairs’ 2025-26 budget estimate. AMRUT, the Smart Cities Mission, Swachh Bharat Urban and PMAY-Urban have changed what many cities deliver. The scale of the task ahead remains vast.

The twenty-first-century Indian story is, increasingly, an urban one. The growth story, the jobs story, the climate story, the middle-class story, all of it concentrates in cities. And yet India’s cities, in both physical and political terms, have long been the orphans of the Constitution. The 74th Constitutional Amendment Act of 1992 was meant to empower urban local bodies with 18 specific functions; three decades on, implementation remains uneven.

What has changed in the past decade is the structural seriousness of the Centre’s urban engagement. Smart Cities Mission. AMRUT I and II. Swachh Bharat Urban. PM-AWAS Urban. PM e-Bus Sewa. National Infrastructure Pipeline’s urban component. The Ministry of Housing and Urban Affairs’ allocation in the 2025-26 Budget rose about 17% over the previous year’s budget estimate, to ₹96,777 crore. Urban, in policy terms, is no longer an afterthought of state-level politics.

1951
17.3%
1971
19.9%
1991
25.7%
2001
27.8%
2011
31.2%
2025 (UN est.)
35.7%
2036 (proj.)
39%

India’s urban population share over time, by official Census definition. Source: Census 1951-2011; UN World Urbanization Prospects estimate for 2025; Technical Group on Population Projections (2020) for 2036. Two caveats: the 2021 Census was postponed and Census 2027 results are not yet out; and India’s administrative definition of urban is narrower than density-based definitions used elsewhere.

The other big number you should know

India’s Total Fertility Rate was 1.9 in 2023 (Sample Registration System), below the replacement level of 2.1. Delhi (1.2) and Tamil Nadu (1.3) are far below replacement; Bihar (2.8) and Uttar Pradesh (2.6) remain above it. On UN projections, India’s population peaks in the early 2060s and then begins a slow decline. The implications for school capacity, urban planning, the labour market, the care economy, and old-age support are all built into the next 15 years of policy choices, even if they are barely visible yet in public debate. The country urbanising fastest is also the one ageing fastest.

Global context

Indian city governments raise and spend far less per resident than their peers in China, Southeast Asia or the West. The gap is not population or wealth alone: it is legal authority, property tax bases, and fiscal devolution.

Property tax collections in India are estimated at only about 0.1-0.2% of GDP, against roughly 1% across OECD countries. Finance Commission grants that reward own-revenue effort are one way to change this.

What has been builtThe urban decade

Urban, reclaimed.

The past decade’s urban missions are the most concerted Centre-led urban programme India has run. Smart Cities. AMRUT I and II. Swachh Bharat Urban. PMAY-Urban. Each has had uneven execution. Taken together, they have changed the physical fabric of many Indian cities and the policy expectation of what cities can deliver.

1992
74th Constitutional Amendment Act, urban local bodies recognised as third tier of government. 18 functions to be devolved to ULBs. Implementation varies by state, three decades on.
2005-14
Jawaharlal Nehru National Urban Renewal Mission (JNNURM), first major central urban infrastructure programme. Mixed results; foundational lessons.
2015
Smart Cities Mission launched, 100 cities selected for area-based and pan-city projects. The mission closed in March 2025 with about 8,000 projects worth roughly ₹1.6 lakh crore reported complete.
2015
AMRUT (Atal Mission for Rejuvenation and Urban Transformation) launched, focus on water supply, sewerage, stormwater drains, urban transport.
2015
Swachh Bharat Urban launched, decade-long campaign for open-defecation-free cities and solid-waste management. Transforms urban sanitation over a decade.
2015
PMAY-Urban launched, housing for the urban poor. About 1.18 crore houses sanctioned; PMAY-U 2.0 (2024) aims at 1 crore more.
2021
AMRUT 2.0 launched with the aim of universal urban tap water and sewerage coverage, water security and reuse.
2023
PM e-Bus Sewa approved (August): 10,000 electric buses for 169 cities.
2024
16th Finance Commission begins work (constituted December 2023). Its award for 2026-31 sets grants to municipalities and is a chance to reward cities that raise their own revenue.
2025-26
MoHUA budget estimate rises about 17% to ₹96,777 crore. AMRUT 2.0 and PMAY-U 2.0 continue.
09 · The scaleFour numbers

The urban arithmetic.

~600 M
Indians projected to live in cities by 2036, up from 377 million in 2011; about 39% of the population.
Technical Group on Population Projections, 2020
$840 B
Urban infrastructure investment needed over the 15 years to 2036, per World Bank estimates: about 1.2% of GDP a year, roughly double the current level. The fiscal gap is the binding constraint.
World Bank, Financing India’s Urban Infrastructure Needs (2022)
₹96,777 cr
MoHUA allocation in Union Budget 2025-26, about 17% above the previous year’s budget estimate. Urban has become a structural priority of the Union Budget in a way it was not a decade ago.
Union Budget 2025-26
~0.1-0.2%GDP
Property tax collection in India, against roughly 1% across OECD countries. The largest untapped own-revenue source Indian cities have.
RBI; World Bank; OECD
What worksFour cases

Four urban models.

Singapore · 1965-present

Land-finance and urban planning

Singapore finances much of its urban infrastructure through land-value capture, the government leases state-held land for 99 years and recycles revenue into infrastructure. Indian experiments with land value capture, from GIFT City to metro-corridor development charges, borrow from this idea. Legal authority to do this at scale remains the Indian constraint.

India · Indore

Municipal execution at its best

Indore ranked first in Swachh Survekshan every year from 2017 to 2023, and in 2024-25 was moved into a new league for repeat toppers. Door-to-door collection of segregated waste covers nearly all households. The model was built through stable municipal leadership, public buy-in and sustained political commitment. Surat’s post-1994 plague transformation is the closest parallel.

India · Bengaluru property tax reform

Doubling revenue through GIS

Bengaluru’s self-assessment scheme for property tax (2008-09), later backed by GIS mapping of properties, raised collections substantially. Other cities have since tried GIS-based property surveys. The technology is not novel; the administrative will is.

India · Tamil Nadu pooled finance

Municipal bonds at scale

Tamil Nadu’s TNUIFSL pools smaller cities’ borrowing capacity to issue investment-grade municipal bonds. Since Pune’s issue in 2017, around a dozen Indian cities have raised money through municipal bonds. Small relative to need; proof that it can be done.

What would workSix levers

Six things that would unlock the urban future.

01
Implement the 74th Amendment, seriously
More than three decades on, many of the 18 functions are still not fully with city governments. Mayors with real five-year terms and fiscal autonomy are the missing piece in most Indian cities. State-level political economy is the binding constraint.
02
Modernise property tax
Satellite imagery, GIS mapping and a unique property ID can raise collections a great deal without new taxes. Finance Commission grants can reward cities that make the shift. Bengaluru’s template is replicable.
03
Build a real municipal bond market
SEBI’s 2015 framework exists; only a dozen or so cities have used it. A pooled-finance vehicle at state level (Tamil Nadu, Kerala templates) lifts smaller cities over the bond-market threshold. The capital exists; the structure to absorb it doesn’t yet.
04
Regularise and upgrade, don’t demolish
In-situ slum upgrading is usually far cheaper, and less disruptive, than relocation housing. Odisha’s Jaga Mission, which gives slum households land rights and upgrades their settlements, won the World Habitat Award in 2023. The blueprint exists; replication is the question.
05
Fund public transport urgently
PM e-Bus Sewa and PM E-DRIVE are a start, but most Indian cities run far fewer buses per person than they need. State-level procurement capacity is the binding constraint; the funding envelope exists. The broader EV transition is also moving: electric vehicles were about 8.5% of new vehicle sales in 2025-26, roughly 2.5 million units, most of them two-wheelers.
06
Plan for the climate already here
Every urban master plan approved now is a 20-to-30-year commitment. Tree cover quotas, blue-green infrastructure, flood-risk mapping, ventilation corridors are health infrastructure, not decoration. Heat plans (Chapter 06) sit at the same planning horizon.
On the numbers

Urban data in India is famously fragmented. The Census (2011; Census 2027 is under way) is the foundation. MoHUA maintains city-level scheme dashboards. World Bank and OECD produce comparative data with their own methodologies. State-level urban statistics vary in quality.

Urban population projections (including the 2036 figures) are from the government’s Technical Group on Population Projections and UN estimates, using demographic transition assumptions that may need revision after the next Census.

Municipal fiscal data is patchy; the NIPFP and Janaagraha City Finance Reports are the most authoritative independent sources. Figures are directional.

Sources & further reading

Primary data: World Bank, Financing India’s Urban Infrastructure Needs (2022); Ministry of Housing & Urban Affairs; 15th & 16th Finance Commission documents.

Research: Isher Judge Ahluwalia HPEC 2011; CPR (Partha Mukhopadhyay, Mukta Naik, Shubhagato Dasgupta); IIHS; Janaagraha City Finance Report; Citizen Matters.

Part 10Governance · Rule of law

Justice
delayed.

India’s courts carry 5.64 crore pending cases (July 2026), one of the largest backlogs anywhere. The pendency keeps rising because new filings keep pace with or outrun disposals. Yet the past decade has brought serious reform: eCourts Phase III, new criminal codes replacing the colonial-era ones in 2024, the Mediation Act 2023, and the 2025 opening for ad hoc High Court judges. The scaffolding is more developed. The scale gap remains.

The Supreme Court had more than 96,000 pending cases in July 2026, over 10,000 of them older than a decade. The 25 High Courts and, above all, the district and subordinate courts that most Indians actually encounter hold the rest. Altogether, 5.64 crore pending cases, roughly one for every 26 Indians.

The problem is not that courts have stopped working. They dispose of crores of cases every year. But as long as new filings match or exceed disposals, the backlog grows.

What has changed in the past decade is the seriousness of the reform. eCourts has computerised most subordinate courts. NJDG provides near-real-time pendency dashboards. The Mediation Act 2023 gave mediation, including voluntary pre-litigation mediation, a statutory framework. The new criminal codes, in force from 1 July 2024, replaced the IPC, CrPC and Indian Evidence Act and added procedural timelines. In January 2025, the Supreme Court allowed High Courts to appoint retired judges as ad hoc judges under Article 224A, up to 10% of sanctioned strength, to hear criminal appeals. Whether any of this compounds into actual backlog reduction is the empirical question of the next five years.

Uttar Pradesh
117lakh
Maharashtra
54lakh
Bihar
38lakh
West Bengal
32lakh
Tamil Nadu
29lakh
Gujarat
26lakh
Rajasthan
23lakh
Karnataka
22lakh
Madhya Pradesh
20lakh
Andhra Pradesh
14lakh
Kerala
13lakh

Judge posts across the 25 High Courts, 1 July 2026. Source: Ministry of Law and Justice data, as reported by ThePrint. About 30% of posts were vacant.

Global context

India has about 21 judges per million people. The Law Commission recommended 50 per million in 1987; the target has not been met in nearly four decades, and many richer democracies have several times India’s ratio.

On case clearance rate, peer benchmarks diverge widely. Countries with functional mediation and specialisation systems (Singapore, Germany) dispose of civil cases in months; India’s average extends to years. Singapore’s 1990s judicial reform package, case management, mandatory mediation, specialised courts, performance metrics for judges, is the most-cited peer case.

What has been doneThe reform decade

Reform, compounding.

Indian judicial reform has usually been incremental. The past decade was less so. The IBC reset commercial insolvency. The Mediation Act 2023 gave statutory shape to a practice that had long existed informally. The 2024 criminal codes were the largest overhaul since the colonial-era originals. The 2025 ad hoc judges ruling revived a constitutional provision that had rarely been used. Whether this reform momentum outpaces the underlying filing growth is the measurable test.

1987
Law Commission of India 120th Report recommends 50 judges per million population. The ratio today (~21) remains a fraction of that target.
2007-08
eCourts Phase I begins, computerisation of subordinate courts. Foundational groundwork for NJDG.
2015
Commercial Courts Act sets up specialised commercial courts and divisions. The National Company Law Tribunal begins work in 2016 and becomes the forum for IBC cases.
2016
Insolvency and Bankruptcy Code, the most consequential commercial-law reform of the decade, moving corporate insolvency to time-bound proceedings before the NCLT.
2019
Fast Track Special Courts scheme for rape and POCSO cases launched, envisaging 1,023 courts; several hundred are now functioning.
2023
Mediation Act creates a statutory framework for mediators, mediation service providers, voluntary pre-litigation mediation and enforcement of settlements.
2024
Bharatiya Nyaya Sanhita, BNSS, Bharatiya Sakshya Act replace the IPC, CrPC and Indian Evidence Act from 1 July 2024, the most comprehensive overhaul of criminal law since the colonial-era codes. They add timelines for investigation, charge-sheets and judgments.
2023
eCourts Phase III approved (September) with a ₹7,210 crore outlay. Focus on end-to-end digital courts, virtual hearings, AI-assisted translation, interoperability with police prosecution.
2025
Supreme Court allows ad hoc judges under Article 224A in High Courts (January), up to 10% of sanctioned strength, aimed at the criminal-appeals backlog.
2025-26
Courts and police adjust to the new codes’ timelines; the India Justice Report 2025 continues its state rankings on police, prisons, judiciary and legal aid.
10 · The scaleFour numbers

The scale problem.

5.64 crpending
Cases across Indian courts, July 2026, most of them in district and subordinate courts. The Supreme Court alone had more than 96,000.
Law Ministry reply in Rajya Sabha, July 2026 (NJDG)
~76%undertrials
Of prison inmates were undertrials at the end of 2023 (4.22 lakh of 5.54 lakh), in prisons running at 120% of capacity. BNSS Section 479 (release after serving part of the maximum sentence) is the main lever; implementation is the variable.
NCRB, Prison Statistics India 2023
~21per mn
India’s judge-to-population ratio. The Law Commission recommended 50 in 1987. About 30% of High Court posts were vacant in July 2026.
Law Commission 120th Report; Ministry of Law and Justice
~50%
Of pending cases are often said to involve the government (Centre or state) as a party, a widely cited estimate. The state is the largest single litigant in India. A disciplined litigation policy could cut much of this.
Law Ministry; LIMBS
What worksFour cases

Four reform models.

Singapore · 1990s

The judicial reform package

Singapore went from a backlog-ridden system in the late 1980s to one of the world’s most efficient judiciaries within about a decade, under Chief Justice Yong Pung How. Case management, mandatory mediation, specialised courts, performance metrics for judges, aggressive caseflow technology. The most-cited peer reform example globally.

India · NCLT/IBC

A reform that worked at scale

The Insolvency and Bankruptcy Code 2016, run through the NCLT, gave creditors a time-bound route that the older system never did. By March 2026, creditors had realised about ₹4.32 lakh crore through approved resolution plans; an IIM Ahmedabad study found they recovered about 32% of admitted claims. Many cases still overrun the 330-day limit. The lesson: specialised benches with focused mandates work, if they are staffed.

India · Lok Adalats

Alternative dispute resolution at scale

Lok Adalats, run by legal services authorities, settle cases by consent; a single National Lok Adalat day in March 2024 disposed of more than 1.1 crore cases, most of them at the pre-litigation stage. Compoundable disputes, motor accident claims, cheque-bounce cases, family matters. A distinctively Indian institution.

India · Delhi HC

Digital administration done right

The Delhi High Court was among the first Indian courts to make e-filing routine and run digital case management at scale. E-filing, digital cause lists and hybrid hearings are now normal there. The gap is uneven adoption across other High Courts and thousands of subordinate courts.

What would workSix levers

Six things that would unclog the system.

01
Fill the vacancies
High Courts had 341 vacant posts against 1,122 sanctioned on 1 July 2026 (about 30%). The collegium pipeline is the single most consequential reform available. Every vacant seat is a year of delay for thousands of litigants. The revised Memorandum of Procedure for appointments has been pending between government and judiciary for about a decade.
02
Reduce government litigation
The state is party to a very large share of pending cases. A functional National Litigation Policy with monetary thresholds for appeals, strict pre-filing review, and accountability for avoidable appeals would clear lakhs of cases. A revised National Litigation Policy has been under discussion for over a decade.
03
Operationalise BNSS timelines
The 2024 codes set timelines for investigation, charge-sheets and judgments. Enforcement requires judges, courtrooms, staff, and administrative discipline. The rules exist; the infrastructure to hold them accountable is still being built.
04
Extend mediation aggressively
The Mediation Act 2023 set the framework. What shifts outcomes is judges who refer early with deadlines, and parties who engage seriously. Commercial Courts have started; family and civil disputes are the next frontier. Singapore’s mandatory-referral-with-consequences model is the operational template.
05
Specialise the benches
NCLT cleared IBC backlogs the High Courts never did. Environmental benches, cyber benches, commercial courts, IP tribunals, GST tribunals. Replicated across the system, specialisation makes existing judges more productive.
06
Address the undertrial crisis
Section 479 of the BNSS provides for release of undertrials who have served half the maximum sentence, or one-third for first-time offenders. District undertrial review committees are meant to meet every quarter; consistent implementation is the test. The lives of lakhs of undertrials depend on the operational reality.
On the numbers

Pendency figures vary across sources (NJDG, Supreme Court annual reports, India Justice Report, PRS, state-level data). NJDG is updated daily; aggregate totals differ slightly across reporting dates.

The ~50% figure for government as litigant is widely cited but not regularly updated; treat as directional.

Undertrial figures come from NCRB Prison Statistics India; the India Justice Report uses the same base. The share has stayed around three-quarters for several years.

Sources & further reading

Primary data: National Judicial Data Grid; India Justice Report 2025; Department of Justice vacancy data; NCRB Prison Statistics.

Research: DAKSH; Vidhi Centre for Legal Policy; PRS Legislative Research; Law Commission of India Reports 120, 230, 245.

Policy: Bharatiya Nyaya Sanhita 2023; Bharatiya Nagarik Suraksha Sanhita 2023; Mediation Act 2023; eCourts Mission Mode Project documentation.

Part 11Governance · Public finance

Where the
rupee goes.

The Union Budget 2026-27 projects total expenditure of ₹53.47 lakh crore. Over the past decade, central capital expenditure has risen from about 1.6% of GDP to about 3.1%. GST pulled a large share of the economy into the tax net. The fiscal deficit has come down from 9.2% of GDP in 2020-21 to a target of 4.3%. The shape of the budget is the shape of the state.

Every February, the Union Budget is laid before Parliament. What people remember from the speech is typically two or three numbers, the tax-slab change, the fiscal deficit, one or two new schemes. What the Budget actually is, however, is a long set of documents that decides how the central government spends about ₹53.5 lakh crore in the year. Twenty-six paise of every rupee the Union spends goes to interest on past borrowing. About fifteen go to the defence ministry and about eight and a half to subsidies. Separately, ₹15.3 lakh crore of central taxes is handed to states as their share.

The past decade’s fiscal story has been one of structural reform layered on cyclical shock. GST (2017) is the largest indirect tax reform in independent India’s history: 17 central and state taxes and 13 cesses folded into one regime. The Insolvency and Bankruptcy Code (2016) gave creditors a time-bound legal route for bad loans. Direct Benefit Transfer through Jan Dhan, Aadhaar and mobile phones is estimated to have saved about ₹3.48 lakh crore in leakages between 2009 and 2024, by one widely reported estimate. Capital expenditure has roughly doubled as a share of GDP. The fiscal deficit went from 3.4% in 2018-19 to 9.2% in 2020-21, and is targeted at 4.3% for 2026-27. The shape of the Indian fiscal state has changed more in the past decade than in the two before it.

Total expenditure
53.47₹ L cr
Interest payments
14.04₹ L cr
Capital expenditure
12.22₹ L cr
Ministry of Defence
7.85₹ L cr
Subsidies
4.55₹ L cr
Pensions
2.96₹ L cr
VB-G RAM G
0.96₹ L cr

Selected items of Union expenditure, Budget Estimates 2026-27, ₹ lakh crore. Source: PRS Legislative Research, Union Budget Analysis 2026-27. Items overlap (defence includes its capital outlay and pensions; capital expenditure spans all ministries), so they do not add up to the total.

Global context

Tax-to-GDP ratio (approximate, general government): India ~18%, China ~20%, United States ~25%, OECD average ~34%. India’s tax base is narrow by peer standards. About 8.8 crore income-tax returns were filed for assessment year 2025-26, around 6% of the population, and far fewer people actually pay income tax.

Interest payments take about 40% of the Union’s revenue receipts in 2026-27 (PRS). The high ratio reflects the accumulated cost of past deficits. When nominal growth runs above the interest rate on debt, the burden eases on its own. The government’s stated anchor is central debt of 50% of GDP (plus or minus 1) by March 2031.

What has been doneThe fiscal reform decade

Reform, compounding.

The past decade’s fiscal reforms, GST, IBC, DBT, the capex push and post-Covid consolidation, add up to the largest change in Indian public finance since 1991. The outcomes are uneven but the direction is clear: a state that collects taxes more efficiently, spends more on productive capital, and is on a credible debt-to-GDP glide path.

2014-16
Direct Benefit Transfer scales up through Jan Dhan, Aadhaar and mobile phones. Savings from reduced leakage are later estimated at about ₹3.48 lakh crore (2009-2024).
2016
Insolvency and Bankruptcy Code, a structural reset for commercial debt recovery, with time-bound resolution.
2017
Goods and Services Tax rolls out (1 July): 17 central and state taxes folded into one. The largest indirect tax reform in independent India.
2019-20
Growth slows. Corporate tax rate cut to 22% (15% for new manufacturing firms) in September 2019.
2020-22
Covid response: fiscal deficit peaks at 9.2% of GDP in 2020-21. PM-Garib Kalyan Yojana provides free food-grains to ~80 crore. Atmanirbhar Bharat package spans economic, social, and financial measures.
2021
Capital-expenditure push begins in earnest: from about 1.7% of GDP in 2019-20 towards 3%. Infrastructure, highways, railways, ports, explicitly prioritised.
2023-24
Gross GST collections cross ₹20 lakh crore in a year. E-invoicing and automated invoice matching through GSTN tighten compliance.
2025
Budget 2025-26 makes income up to ₹12 lakh free of tax under the new regime; revenue forgone is put at about ₹1 lakh crore. GST rates are cut and simplified from 22 September.
2025-26
Fiscal deficit target 4.4%, down from 4.8% in 2024-25. Capital expenditure budgeted at 3.1% of GDP.
Late 2025
MGNREGA replaced by VB-G RAM G (Viksit Bharat-Guarantee for Rozgar and Ajeevika Mission, Gramin) in December 2025. Statutory entitlement raised from 100 to 125 days; Centre-State funding shifts from 100% Centre wages to a 60-40 split (90-10 for North-East and Himalayan states). The fiscal-federalism implications are large.
2026-27
Fiscal deficit target 4.3%. Total expenditure ₹53.47 lakh crore. VB-G RAM G allocated ₹95,692 crore (about 49% of the Department of Rural Development’s budget), with ₹30,000 crore more for residual MGNREGS liabilities.
11 · The compositionFour numbers

The shape of the state.

~₹53.5 L cr
Union government expenditure, Budget Estimates 2026-27 (₹53,47,315 crore), 7.7% above the previous year’s revised estimate.
Union Budget 2026-27
~26%
Of total Union spending goes to interest payments, the single largest line item. Equivalent to ~40% of revenue receipts.
PRS Legislative Research
~4.3%of GDP
Fiscal deficit target for 2026-27, down from 4.8% in 2024-25 and the 9.2% Covid-year peak. Consolidation has largely held to plan.
Union Budget 2026-27
~3.1%of GDP
Central capital expenditure as a share of GDP (₹12.22 lakh crore in 2026-27), up from about 1.6% in 2014-15. The biggest shift in the make-up of Union spending in a generation.
Union Budget capex data, MoF
What worksFour cases

Four fiscal reforms.

Brazil · Bolsa Familia

Direct transfers at scale

Brazil’s Bolsa Família, launched in 2003, now reaches around 20 million families and is the best-known conditional cash transfer in the world. India’s DBT runs through hundreds of central schemes and rests on digital plumbing (Aadhaar, Jan Dhan accounts, payment rails) that Brazil did not have.

India · IBC/NCLT

Structural creditor-debtor reset

Under the Insolvency and Bankruptcy Code 2016, creditors had realised about ₹4.32 lakh crore through resolution plans by March 2026. India’s rank on the World Bank’s “resolving insolvency” indicator rose from 136 (2017 report) to 52 (2020 report). The single most consequential commercial-law reform of the decade.

India · GSTN

Digital tax infrastructure

GSTN runs e-invoicing, e-way bills and input tax credit matching for crores of invoices a month. The formalisation of SMEs through mandatory GST filing is an under-appreciated structural shift.

Estonia · e-Tax

Return-less tax filing

Estonia pre-fills income-tax returns from employer and bank reporting, so most residents file online in a few minutes. India has the data infrastructure (TDS, AIS, Form 26AS) to do this; the policy design to complete the pre-filing shift is the remaining step.

What would workSix levers

Six things that would reshape the budget.

01
Expand the direct tax base
Income-tax returns cover only about 6% of Indians, and payers are fewer still. At 2026-27 GDP, every percentage point of tax-to-GDP is roughly ₹3.9 lakh crore of fiscal space. India’s tax technology is world-class; the political willingness to use it for compliance rather than coercion is the constraint.
02
Stay on the fiscal consolidation path
When nominal growth exceeds the interest rate on debt, the debt ratio falls on its own. The target of central debt at 50% of GDP by 2031 is credible if growth holds. Disciplined consolidation plus growth is the only honest path; monetising deficits through RBI always ends in inflation.
03
Consolidate centrally-sponsored schemes
Centrally sponsored schemes were folded into 28 umbrella schemes in 2016, after a sub-group of chief ministers convened by NITI Aayog. Giving states more freedom within those umbrellas would raise outcomes per rupee spent.
04
Target subsidies, don’t eliminate them
DBT-Aadhaar targeting of LPG has reduced leakage substantially. Food subsidies (about ₹2.3 lakh crore in 2026-27) remain less targeted. A means-tested food subsidy with higher transfers to the bottom quintile would spend similar money with larger welfare effect.
05
Bind medium-term expenditure
FRBM targets get revised often. A binding Medium-Term Expenditure Framework, committing departments to 3-year rolling envelopes, forces prioritisation and ends the December rush to spend unused budgets.
06
Strengthen state capacity for public goods
Government spends about 1.5% of GDP on health (NHA 2022-23), between about 2.7% and 4.1% on education depending on the measure, and gross R&D spending is about 0.6-0.7% of GDP. The gap is not total resources (the budget is large); it is prioritisation within the budget. Every 0.1 percentage point shift is roughly ₹39,000 crore. Compounded over a decade, this is transformative.
On the numbers

Budget figures come from Ministry of Finance documents. PRS Legislative Research produces a concise analysis within a week of each budget, the most accessible third-party source. CAG audit reports assess actual vs budgeted spending.

BE (Budget Estimate) figures are revised to RE (Revised Estimate) mid-year and ultimately to Actuals 18-24 months later. All percentages of GDP use projected nominal GDP, on the new 2022-23 base series.

Tax-to-GDP comparisons across countries vary slightly by methodology (whether social security contributions are included, etc.). Treat as directional.

Sources & further reading

Primary data: Union Budget 2026-27; PRS Union Budget Analysis; Economic Survey 2025-26; 15th and 16th Finance Commission reports.

Research: NIPFP (Pinaki Chakraborty, M. Govinda Rao); Rathin Roy; CAG audit reports; Accountability Initiative Budget Briefs; CBGA (Centre for Budget and Governance Accountability).

Part 12Environment · Climate

From coal
to sun.

In June 2025, India reached 50% non-fossil electricity capacity, five years ahead of the 2030 goal in its updated Paris NDC. Solar capacity has risen about sixty-fold since 2014, and India is now the world’s third-largest producer of solar power. Coal still dominates actual generation; the transition is partial. But the direction and the policy architecture are clear.

In March 2014, India had about 2.6 GW of solar. By July 2026, it had 164.6 GW. Total installed electricity capacity reached 552 GW, of which 300.5 GW (54%) was non-fossil. India met its NDC goal of 50% non-fossil capacity in June 2025, five years early, and ranks third in the world in installed renewable capacity (IRENA 2026).

The policy machinery has matured in parallel. The policy machinery has matured in parallel. With PLI support and the approved list of models and manufacturers (ALMM), listed solar-module capacity passed 170 GW by March 2026, though cell manufacturing is far smaller. PM Surya Ghar Muft Bijli Yojana targets 1 crore rooftop-solar households by 2026-27; about 50 lakh had installations by August 2026. Two rounds of viability-gap funding (2023 and 2025) back about 34 GWh of battery storage. The Green Hydrogen Mission targets 5 million tonnes a year by 2030. GST on renewable equipment fell from 12% to 5% from 22 September 2025.

What hasn’t fully closed: coal still produces around 70-75% of actual electricity (capacity is not generation). Transmission bottlenecks are causing peak-hour curtailment in some states. Discom finances remain fragile, with cumulative losses above ₹6 lakh crore. A formal just-transition framework for coal-dependent states is still being built. The transition is real and measurable. Its completion depends on storage, transmission, and discom reform.

Mar 2014
2.6GW
Mar 2016
6.8GW
Mar 2018
21.7GW
Mar 2020
34.6GW
Mar 2022
54GW
Mar 2024
81.8GW
Mar 2025
105.6GW
Jul 2026
164.6GW
2029-30 plan
293GW

Cumulative installed solar capacity in India (GW). Source: MNRE and CEA; the 2029-30 figure is the CEA’s optimal generation mix, within the 500 GW non-fossil goal. Costs have fallen sharply: solar auctions have cleared below ₹2.50/kWh since 2017, cheaper than power from new coal plants.

Global context

Per-capita fossil CO₂ emissions, 2024 (tonnes): US ~14.2, Russia ~12.3, China ~8.7, Japan ~7.8, Germany ~6.8, world average ~4.7, India ~2.2, Bangladesh ~0.6 (Global Carbon Project, via Our World in Data). India is the third-largest absolute emitter and among the lowest per person in the G20. Its share of cumulative global emissions since 1850 is about 3%.

Among large developing economies, India’s pace of transition is near the front. Brazil has a cleaner grid, but it is built on hydropower; India’s transition is harder because it adds solar and wind on top of a coal-based system.

What has been doneThe clean-energy decade

Transition, accelerating.

The past decade has been the most consequential in Indian energy policy since independence. Solar capacity up about sixty-fold. Wind past 58 GW. Solar-module manufacturing from a small base to over 170 GW of listed capacity. PM Surya Ghar targeting 1 crore rooftop households. Battery storage tendering under way. Green Hydrogen Mission funded. Among the most ambitious energy-transition programmes of any large developing economy.

2015-16
National Solar Mission target raised to 100 GW of solar by 2022 (June 2015). Solar Parks scheme launched (December 2014).
2017
Solar tariffs fall below ₹2.50/kWh at auctions for Bhadla, Rajasthan, cheaper than power from new coal plants.
2019
PM-KUSUM launched, solar pumps for farmers, decentralised generation on barren farm land.
2021
India announces at COP26: the Panchamrit, including 500 GW of non-fossil capacity by 2030, half of energy requirements from renewables by 2030, and net zero by 2070.
2022-23
Updated NDC (August 2022) commits to 50% non-fossil capacity by 2030. National Green Hydrogen Mission approved in January 2023 with ₹19,744 crore; target 5 million tonnes a year by 2030.
2023
PLI for high-efficiency solar modules (second tranche, ₹19,500 crore, approved in 2022) drives a sharp rise in domestic module capacity.
2024
PM Surya Ghar Muft Bijli Yojana launched (February), targeting 1 crore rooftop-solar households by 2026-27 with subsidy up to ₹78,000 per household.
2023-25
Battery storage: viability-gap funding for 4 GWh (2023) and a further 30 GWh (June 2025, ₹5,400 crore).
2025
India hits 50% non-fossil capacity in June 2025, five years ahead of NDC target. Solar crosses 100 GW in early 2025. India adds over 55 GW of non-fossil capacity in 2025-26, including a record 6 GW of wind. GST on renewable equipment cut from 12% to 5% from 22 September 2025.
2025-26
Nuclear Energy Mission for small modular reactors announced with ₹20,000 crore (Budget 2025-26); the SHANTI Act (December 2025) opens civil nuclear power to private players, towards a goal of 100 GW of nuclear by 2047. India ranks third in renewable capacity in IRENA’s 2026 statistics.
12 · The transitionFour numbers

The acceleration.

~54%
Non-fossil share of installed electricity capacity, July 2026. The 50% threshold was reached in June 2025, five years ahead of the NDC goal.
Ministry of New & Renewable Energy, August 2026
~552GW
Total installed electricity capacity, July 2026, up from 249 GW in 2014. Solar: 164.6 GW. Wind: 58.1 GW. Non-fossil in all: 300.5 GW.
MNRE and CEA, July 2026
~2.2tCO₂/cap
India’s per-capita fossil CO₂ emissions, 2024. US ~14.2; world average ~4.7. India is the third-largest absolute emitter; among the lowest per person in the G20.
Global Carbon Project, via Our World in Data
170+GW/yr
Solar-module manufacturing capacity on MNRE’s approved list (ALMM), March 2026. Module assembly has outrun cell and wafer capacity, which remains the dependence on imports.
MNRE ALMM, 2026
What worksFour cases

Four transition models.

China · 2010-present

Manufacturing and deployment at scale

China built solar manufacturing and deployment together. It added about 277 GW of solar in 2024 alone. The Chinese lesson for India is industrial-policy coordination: module manufacturing, cell manufacturing, polysilicon, and deployment subsidies moving together. India’s PLI for solar modules is the adapted template.

India · Gujarat Solar Park

The solar-park template

Charanka Solar Park in Gujarat (2012) was India’s first large solar park. The template, land pooled by the state, transmission built in advance, competitive auctions, helped push tariffs below ₹2.50/kWh by 2017. The national solar parks scheme has since spread it to over a dozen states; Bhadla (Rajasthan), at about 2.2 GW, was for a time among the world’s largest.

Germany · Energiewende

Distributed solar at household scale

Germany’s Renewable Energy Sources Act (2000) and its guaranteed feed-in tariffs made rooftop solar bankable for households, farmers and community cooperatives. The Indian PM Surya Ghar scheme is the adapted architecture for distributed rooftop deployment at household scale.

Vietnam · 2017-20

The rapid-deployment cautionary tale

Vietnam added about 16 GW of solar between 2019 and 2020 on generous feed-in tariffs, then faced grid congestion and curtailment. The lesson: deployment without matching transmission and storage capacity produces stranded assets. India’s Green Energy Corridor and Battery Storage schemes are the deliberate answer to this risk.

What would workSix levers

Six things that would complete the transition.

01
Displace coal generation, not just add renewables
India has added renewables. Coal generation has also grown because demand has grown faster. Capacity is not generation: more than half of capacity is non-fossil, but only about a quarter of electricity generated is. Retiring oldest coal plants while substituting with firm renewables (solar+storage, RTC tenders) is the harder next phase.
02
Build the transmission, or solar doesn’t flow
Green Energy Corridors Phases I and II are closing the evacuation gap; the CEA’s national transmission plan puts the need at about ₹9.15 lakh crore by 2032. Without transmission, renewable capacity risks curtailment.
03
Fix discom finances
State distribution companies carry accumulated losses of over ₹6 lakh crore. Tariff rationalisation is politically fraught. UDAY, RDSS, prepaid smart metering are the current interventions; structural change is unfinished. Without financially solvent discoms, the off-taker for renewable power is fragile.
04
Scale storage manufacturing
Installed battery storage is still a small fraction of what the grid will need by 2030. PLI for Advanced Chemistry Cells (₹18,100 crore) aims to replicate the solar-module success for batteries. Execution is early; China still dominates upstream lithium and cell manufacturing.
05
Build a just-transition framework
Jharkhand, Chhattisgarh, Odisha, and Bengal depend on coal employment and revenue. A credible national just-transition policy, reskilling, industrial diversification, revenue substitution, would shore up the political coalition for coal retirement.
06
Invest in electric mobility, at scale
FAME, PM E-Drive, PM e-Bus Sewa, PLI-ACC, and tariff-support structures are in place. Electric vehicles were about 8.5% of new vehicle sales in 2025-26, roughly 2.5 million units, most of them two-wheelers and three-wheelers; electric cars remain a small share. Public charging stations passed 52,700 by July 2026. Indonesia and Thailand have more aggressive consumer subsidies; India has leaned more on supply-side PLI.
On the numbers

Installed capacity figures from CEA and MNRE are updated monthly and are authoritative. Generation figures (how much electricity is actually produced) are reported separately and lag capacity additions. All figures are directional.

Per-capita emission comparisons use Global Carbon Project data via Our World in Data. Methodologies and base years vary slightly across sources.

Module “capacity” on the ALMM is nameplate capacity listed by manufacturers, not output; actual production is lower.

Sources & further reading

Primary data: Ministry of New & Renewable Energy; Central Electricity Authority; Ember Energy India Report; Our World in Data emissions; IRENA Renewable Capacity Statistics 2026.

Research: CEEW; IEEFA; Prayas (Energy Group); CSEP (formerly Brookings India) energy work.

Part 13Governance · Digital infrastructure

Built on
trust.

About half of the world’s real-time payment transactions happen in India. UPI grew from about 2 million transactions in December 2016 to 25.47 billion in October 2026. An IMF note (2025) describes it as the world’s largest retail fast-payment system by volume, and it is accepted in around ten countries, from the UAE, Singapore, Bhutan and Nepal to France and Qatar. Aadhaar covers almost the entire resident population. ONDC, Account Aggregators, DigiLocker, Bhashini. The India Stack is among the most widely studied policy exports of the Global South.

In 2009, India did not have a system of digital identity covering its population. In 2016, it did not have a real-time payments system. By 2026, Aadhaar had issued over 142 crore numbers (the world’s largest digital-identity programme), and UPI handled 25.47 billion transactions worth ₹31.53 lakh crore in October 2026 alone. DigiLocker and ONDC had moved from pilots to everyday use, and Account Aggregators had begun carrying consented financial data at scale. In February 2026 India hosted the AI Impact Summit at Bharat Mandapam, the first in the series held in the Global South. None of these existed fifteen years ago. Together they have changed how hundreds of millions of Indians deal with the state and with money.

The India Stack is a set of interoperable digital public goods, each addressing a specific foundational gap and working with the others. Aadhaar provides identity. UPI provides payments. DigiLocker provides document storage. DEPA / Account Aggregator provides consented data sharing. ONDC provides an open protocol for e-commerce. Bhashini provides language translation. GSTN provides tax infrastructure. Together they are among the most ambitious attempts by any state to build population-scale digital utilities.

Dec 2016
2mn txns
Dec 2018
620mn txns
Dec 2020
2234mn txns
Dec 2022
7829mn txns
Dec 2024
16730mn txns
Oct 2026
25470mn txns

Monthly UPI transactions (millions). Source: NPCI. The 2016-20 ramp was partly driven by demonetisation and pandemic cash avoidance; 2020-onward growth is structural adoption across merchants, P2P transfers, and increasingly cross-border use cases.

Global context

Share of global real-time payment transactions in 2023 (ACI Worldwide): India ~49%, Brazil (Pix) ~14%, Thailand (PromptPay) ~8%, China ~6%, South Korea ~3%. Card-dominant economies have been slower adopters. Brazil’s Pix launched in 2020 and grew fast; India’s UPI started in 2016 and remains the largest.

India has signed agreements to share India Stack solutions with around a dozen countries, including Armenia, Sierra Leone, Suriname, Papua New Guinea, Trinidad & Tobago, Kenya, Cuba, Colombia and Antigua & Barbuda. DPI also featured prominently in India’s 2023 G20 presidency.

What has been builtThe stack decade

The India Stack, assembled.

The past decade and a half has produced one of the most consequential sets of public digital infrastructure anywhere. Not the most advanced technically, Estonia’s is arguably ahead, but unmatched in scale. The India Stack has become a template studied and adapted by countries across the Global South.

2009
Unique Identification Authority of India (UIDAI) established. First Aadhaar number issued September 2010.
2014
Pradhan Mantri Jan Dhan Yojana launched (August), aiming at a bank account for every household. Crosses 53 crore accounts by August 2024.
2016
UPI launched by NPCI (pilot in April). About 2 million transactions in December 2016, after demonetisation.
2017
Goods and Services Tax Network (GSTN) goes live. Foundational infrastructure of the GST regime.
2018
Supreme Court Aadhaar judgment (K.S. Puttaswamy v UoI II) upholds Aadhaar for welfare subsidies; restricts mandatory private-sector linkage. Sets constitutional boundaries.
2020
UPI transactions cross 2 billion a month (October) during the pandemic.
2021
Account Aggregator framework goes live (September): consent-based financial data sharing through RBI-licensed aggregators.
2022
ONDC (Open Network for Digital Commerce) pilot begins (April), a protocol-level attempt to unbundle e-commerce from large platforms.
2023
Digital Personal Data Protection Act 2023 passed (August), India’s first comprehensive privacy law. The DPDP Rules followed in November 2025, with obligations phased in over 18 months.
2024
16.73 billion UPI transactions in December. RBI announces the Unified Lending Interface (August), DPI for credit, and begins piloting it.
2025-26
UPI reaches 25.47 billion transactions (₹31.53 lakh crore) in October 2026. An IMF note describes it as the world’s largest retail fast-payment system by volume. UPI accepted in around ten countries.
Early 2026
AI Impact Summit at Bharat Mandapam, New Delhi (February), the first summit in the series hosted in the Global South.
13 · The scaleFour numbers

The India Stack, quantified.

25.47 bn/month
UPI transactions in October 2026. In December 2016 there were about 2 million, an increase of more than ten thousand times in under a decade.
NPCI; IMF FinTech Note 2025
₹31.53 L cr
Value of UPI transactions in October 2026, a festive-season record; the daily average crossed ₹1 lakh crore for the first time.
NPCI
~142 cr
Aadhaar numbers generated, covering almost the entire resident population. The world’s largest digital-identity system.
UIDAI
₹3.48 L crsaved
Estimated savings from reduced leakage through Direct Benefit Transfer, 2009-2024, by one widely reported estimate. The fiscal case for DPI is not just digitisation, it is leakage reduction.
Reported in Business Today, April 2025
What worksFour cases

Four DPI cases.

Brazil · Pix

The Pix parallel

Brazil launched Pix (central-bank-operated instant payments) in November 2020. By 2023, Pix accounted for about 14% of global real-time payments. Pix and UPI together handle more than three-fifths of global real-time payment volume. The structural choice, public-utility payment rails over card networks, is now visibly global.

Estonia · X-Road

Data interoperability done right

Estonia’s X-Road, in use since 2001, lets government and private databases exchange data securely without a central store. Nearly all government services are online, used through a single digital identity. India’s consent-based data-sharing frameworks (DEPA, Account Aggregators, ABDM) pursue a similar goal by different means.

Singapore · Singpass

National digital identity at scale

Singpass covers all Singapore residents with biometric + password + app-based multi-factor identity. Used for tax filing, government benefits, medical records and banking. The Singapore model is more integrated with private-sector services than Aadhaar is.

India · CoWIN

DPI at crisis scale

CoWIN scheduled and certified over 220 crore Covid vaccine doses, one of the largest vaccination drives ever run. Its code was later offered to other countries as DPI. The case study most cited globally for what Indian DPI can do at emergency scale.

What would workSix levers

Six things that would protect the stack.

01
Operationalise data protection with teeth
The DPDP Act 2023 is the legal foundation. Rules, the Data Protection Board, and a meaningful penalty regime are the implementation test. Without credible enforcement, the Act is compliance theatre; with it, Indian DPI becomes one of the best-governed data ecosystems globally.
02
Build the audit trail, not just the API
Every Aadhaar authentication visible to the resident is technically trivial and governance-critical. Complaint-resolution for DBT failures, eKYC errors, and authentication mismatches remains patchy. The tech scales; the grievance-redress should scale with it.
03
Lock in UPI openness
PhonePe and Google Pay together handle about four-fifths of UPI volume. NPCI’s 30% market-share cap for any one app has been deferred repeatedly, most recently to the end of 2026. Enforcing the cap, even with a long glide path, would distribute risk and preserve the openness that makes UPI a public good.
04
Scale ONDC deliberately
ONDC is the clearest test of protocol-vs-platform. Early traction is real but small relative to the gravity of Amazon and Flipkart. Government should patiently back it rather than rush to declare victory.
05
Fund DPI as public infrastructure
NPCI is a non-profit owned by banks. UIDAI is a statutory body. Long-term sustainability requires a settled funding model. A thin transaction levy, central-bank allocation, or regulated fee structure, all technically possible; none yet settled.
06
Export DPI with the governance lessons
India’s India Stack agreements are legitimate soft power. Sharing the flaws, Aadhaar exclusion cases, UPI concentration, unfinished privacy architecture, is as important as sharing the architecture. Other jurisdictions should adopt with eyes open.
On the numbers

UPI transaction data is reported monthly by NPCI and is considered authoritative. Volume and value figures are updated in real time and widely cross-referenced by RBI.

Aadhaar figures are reported by UIDAI. The 142 crore figure is cumulative numbers generated; live Aadhaar numbers (excluding the deceased) are a somewhat different figure.

DBT leakage savings (₹3.48 lakh crore, 2009-2024) is one estimate; others differ, and some “savings” reflect genuine beneficiaries wrongly excluded. Treat as directional.

Sources & further reading

Primary data: NPCI payment statistics; UIDAI; ONDC; RBI Payment System Statistics.

Research: ORF America Digital Public Infrastructure (2026); Nilekani & Shah Rebooting India; Reetika Khera on Aadhaar & welfare; Rahul Matthan The Third Way.

Commentary: MediaNama; IFF; SFLC.

Part 14Governance · Democracy

The ballot
box.

About 642 million Indians voted in the 2024 general election, the largest election ever held. Over 1 million polling stations. About 1.5 crore polling and security staff. Electoral bonds struck down by the Supreme Court weeks before polls opened. The BJP won 240 seats, down from 303, and governs with allies; the Congress won 99, up from 52. A record 31.2 crore women voted. The exercise itself, at this scale, is the achievement.

Between 19 April and 1 June 2024, India conducted its 18th general election. 642 million voters cast ballots. 969 million were eligible. The exercise unfolded over 44 days, across 7 phases, at 1.05 million polling stations, administered by 15 million election workers and security personnel. For scale: more Indians voted in 2024 than the combined populations of the United States, Russia and Japan.

Every one of those numbers is a statistic. Together, they are a claim: that an electoral system of this scale can function, in a country with 22 scheduled languages, 28 states, 8 union territories, a geography that includes the Himalayas and the Andamans, and income levels that span from the poorest villages in Bihar to the richest neighbourhoods in Mumbai. It worked. Again.

The story of the past decade’s electoral reforms is a mix: some genuine improvements (home voting for elderly and disabled voters, record female turnout, accessibility infrastructure, the 2023 Women’s Reservation Act); some open questions (the 2023 CEC & ECs Appointment Act’s executive-majority selection panel; the post-electoral-bonds political-finance vacuum). The process is strong. The reforms that compound it further are the ongoing work.

1st LS (1952)
45.7%
5th LS (1971)
55.3%
8th LS (1984)
63.6%
13th LS (1999)
59.9%
15th LS (2009)
58.2%
16th LS (2014)
66.4%
17th LS (2019)
67.4%
18th LS (2024)
65.8%

Voter turnout in selected Lok Sabha elections, 1952-2024. Source: Election Commission of India. 2014 began a run of 65%-plus turnout; 2019’s 67.4% is the highest so far.

Global context

Voter turnout in recent national elections: India 2024 (~66%), Australia 2022 (~90%, compulsory), Germany 2025 (~83%), Brazil 2022 (~79%), France 2022 presidential first round (~74%), United States 2024 (~64% of eligible voters), United Kingdom 2024 (~60%).

India’s turnout is comparable to established Western democracies, at a population scale none of them approach. No other democracy runs an election on anything close to this scale.

What has been doneThe expanding franchise

The process, expanded.

The mechanics of Indian elections have been steadily refined over the past decade. VVPAT at every booth since 2019. Home voting for voters over 85 and voters with disabilities in 2024. Ramps and other minimum facilities at polling stations. Women’s Reservation Act on the books. Record female participation. None of these solves the deeper political-finance and representation questions; all of them make the mechanics more inclusive.

1950
Election Commission of India established, a constitutional body under Article 324, on 25 January. The first general election (1951-52) brings universal adult suffrage to some 17 crore voters at once.
1982
Electronic Voting Machines first used, in Paravur, Kerala. The law is amended to provide for them in 1988; every Lok Sabha seat votes on EVMs from 2004.
2013
NOTA (None of the Above) option introduced after a Supreme Court judgment (PUCL, September 2013).
2013
VVPAT (Voter-Verified Paper Audit Trail) first used, in a by-election in Nagaland; every booth has one from the 2019 general election.
2023
Nari Shakti Vandan Adhiniyam (106th Amendment), 33% women’s reservation in Lok Sabha and state assemblies. First major structural reform after 27 years of attempts.
2023
Chief Election Commissioner and Election Commissioners Appointment Act passed, selection panel of PM, Leader of Opposition, and a Union Minister. Petitions challenging it have been pending before the Supreme Court.
2024
Electoral bonds struck down by Supreme Court, 15 February 2024, weeks before polls opened. SBI ordered to release donor data; published March 2024.
2024
Home voting offered in a Lok Sabha election for the first time to voters above 85 and persons with benchmark disabilities. Braille on EVMs and assured minimum facilities at polling stations.
2024
18th Lok Sabha elections: 642 million voters, 312 million of them women, the most ever. BJP 240 seats, NDA 293, INDIA bloc 234. Return to coalition government.
2026
131st Constitutional Amendment (to delink Women’s Reservation from post-Census delimitation) tabled; fails on the floor 17 April 2026.
14 · The scaleFour numbers

The largest democratic exercise.

~642 Mvoters
Indians who voted in the 2024 Lok Sabha elections, more than the populations of the US, Russia, and Japan combined.
Election Commission of India, 2024
~312 Mwomen
Women who voted in 2024, the most ever. In many states, female turnout exceeded male turnout.
ECI Gender Voter Turnout Data
~1.05 Mbooths
Polling stations across India, run by about 1.5 crore polling and security staff over 44 days and 7 phases.
ECI Election Infrastructure Report
~₹1.35 L cr
Estimated total spending in the 2024 general election, candidates, parties and the state combined. By CMS’s reckoning, the most expensive election ever held anywhere.
Centre for Media Studies
What worksFour cases

Four electoral models.

India · the EVM-VVPAT system

Domestic innovation at scale

Indian EVMs are stand-alone, not networked, and paired with VVPAT audit trails since 2019. In April 2024 the Supreme Court rejected petitions seeking a return to paper ballots or a full count of VVPAT slips. Debate over audit levels continues.

Brazil · TSE

The digital-court model

Brazil’s Superior Electoral Court runs electronic voting for over 150 million voters and is notable for quick result-declaration and public-facing transparency dashboards. The Brazilian model is more vertically integrated than India’s; each has strengths.

India · ADR/MyNeta

Civic-tech candidate transparency

The Association for Democratic Reforms (ADR) won Supreme Court rulings in 2002 and 2003 that require candidates to disclose assets, criminal records and education. MyNeta.info compiles these disclosures for candidates across elections, one of the most consequential civic-tech efforts in Indian democracy.

Global · IFES

Electoral assistance at scale

IFES (International Foundation for Electoral Systems) has worked on elections in more than 140 countries since 1987. Election bodies everywhere study India’s logistics for running a vote at population scale.

What would workSix levers

Six things that would deepen the democracy.

01
Restore transparency to political finance
Electoral bonds are gone. What replaces them is unresolved. Mandatory disclosure of donations above a low threshold, real-time donor transparency, and strict audit enforcement would bring Indian political finance into line with peer democracies. The political will to legislate has been absent for a decade; the gap left by electoral bonds is a reason to revisit it.
02
Resolve the delimitation question
The 84th Amendment froze Lok Sabha seat counts until the first Census after 2026. Census 2027 is now under way. The Women’s Reservation Act depends on it. The 131st Amendment (2026) attempt to delink failed on the floor. The question is overdue and politically combustible.
03
Structural independence for the ECI
The 2023 CEC & ECs Appointment Act gave the executive a majority on the selection panel; civil-society petitions are before the courts. Security of tenure, post-retirement bars, and independent funding all matter for the ECI to maintain the institutional reputation it has built.
04
Mandate machine-readable candidate disclosure
ADR’s MyNeta has done this voluntarily for two decades. Machine-readable disclosure mandated by ECI in all Indian languages would compound the transparency effect.
05
Address criminal-candidate share
251 of the 543 MPs elected in 2024 (46%) declared criminal cases against themselves (ADR analysis). Supreme Court directions requiring parties to publicly justify such nominations exist; compliance is patchy. Enforcement would change the incentive structure for ticket distribution.
06
Consider public funding of elections
The Indrajit Gupta Committee (1998) recommended partial state funding of elections, and the Law Commission has examined the idea more than once. A comprehensive political-finance reform package combining disclosure, public funding, and private-donation caps has been on the table for decades; it needs a cross-party conversation.
On the numbers

Election data comes from the Election Commission of India’s official Statistical Reports, released after each general election. The 2024 reports are on the ECI website.

Voter turnout is reported as polling-station turnout; gross turnout (including postal ballots) is slightly higher. Independent organisations (Lokniti-CSDS, ADR) produce parallel analyses.

Campaign expenditure estimates from Centre for Media Studies combine candidate, party, and state machinery spending; different methodologies produce figures within a broad range.

Sources & further reading

Primary data: Election Commission of India 2024 Statistical Reports; OGD Platform India; IndiaVotes.

Candidate / finance: Association for Democratic Reforms; MyNeta; Centre for Media Studies.

Research: Lokniti-CSDS post-election surveys; Yogendra Yadav, Suhas Palshikar; Pradeep Chhibber and Rahul Verma.

Part 15Growth · The economy

The growth
story.

India is the world’s third-largest economy by purchasing power parity and has been the fastest-growing large economy in most recent years. Real GDP grew 7.7% in 2025-26 (provisional estimate, new 2022-23 base). Over the past decade the economy has roughly doubled in dollar terms, the number of airports has roughly doubled, and India has gone from importing most of its mobile phones to being the second-largest producer. Gross FDI inflows rose from $36 billion in 2013-14 to about $81 billion in 2024-25. The Global Innovation Index rank moved from 81 (2015) to 38 (2025). The growth story is real; the manufacturing share remains the unfinished question.

In 2014, India was around the world’s tenth-largest economy at current dollar prices. In IMF data for 2025 it ranks sixth (about $3.9 trillion), behind Japan and the UK, after a weaker rupee and a downward GDP base revision in February 2026; the IMF projects India to be fourth by 2027. By purchasing power parity it is third. Measured in rupees, growth has stayed strong; the dollar ranking moves with the exchange rate.

Infrastructure has followed the macro story. About 160 airports today against 74 in 2014. Tens of thousands of kilometres of new four-lane highway, including stretches of the Delhi-Mumbai Expressway. Expanded port capacity. Metro rail in 26 cities. Foreign exchange reserves of about $720 billion in November 2026. Gross FDI inflows grew from about $36 billion in 2013-14 to about $81 billion in 2024-25; the government reports manufacturing FDI of about $165 billion over 2014-24, 69% more than in the previous decade.

The manufacturing push is the central economic bet of this period. A 25% manufacturing share of GDP has been the stated goal since the 2011 National Manufacturing Policy and Make in India; the National Manufacturing Mission announced in Budget 2025-26 is the latest vehicle. PLI schemes in 14 sectors had drawn about ₹2.4 lakh crore of investment and some 14 lakh jobs by March 2026 (DPIIT). The government counts about 300 mobile-phone units today against 2 in 2014. About 99% of phones sold in India are now made in India. India is now the world’s second-largest mobile manufacturer.

South Korea
27.4% GDP
China
24.7% GDP
Vietnam
24.5% GDP
Thailand
23.7% GDP
Bangladesh
22.4% GDP
Malaysia
22.1% GDP
Germany
17.6% GDP
India
13.5% GDP
Brazil
11.8% GDP
United States (2021)
10.5% GDP

Manufacturing value added as % of GDP, 2025 unless noted. Source: World Bank World Development Indicators, via Our World in Data. India’s own national accounts, on a different basis, put the share somewhat higher; the gap with East Asia holds either way.

Global context

India’s real growth of 7.7% in 2025-26 compares with roughly 5% in China and 2-3% or less in most large advanced economies in IMF estimates. Few large economies have grown above 6% as consistently.

Manufacturing share of GDP is the structural gap. China, Vietnam, Bangladesh, Thailand and Malaysia are all above 22%; India sits near 13.5% in World Bank data. The gap is the link between Chapter 03 (Jobs) and Chapter 15 (Growth). Without a larger manufacturing share, the youth-employment problem cannot be solved durably.

What has been builtThe acceleration decade

The climb, compounding.

The past decade paired growth with a long list of structural reforms: IBC, GST, the corporate tax cut, PLI, DPI, logistics policy, DBT, fiscal consolidation. None of these alone explains the growth; together they form the most extensive reform package since 1991.

2014
Make in India launched (September), aiming to raise manufacturing to 25% of GDP by 2022, a goal carried over from the 2011 National Manufacturing Policy.
2016
Insolvency and Bankruptcy Code, a structural commercial-law reform that helped work through the bad-loan logjam.
2016
World Bank Doing Business ranking: India at 130 (2017 report), rising to 63 by the 2020 report. The ranking was discontinued in 2021.
2017
GST rollout, single biggest indirect-tax reform in independent India. Subsequent years see steady formalisation of the SME economy.
2019
Corporate tax rate cut to 22%, and 15% for new manufacturing firms (September).
2020
Production Linked Incentive (PLI) schemes launched across 14 sectors with cumulative outlay ~₹1.97 lakh crore. Structural commitment to manufacturing scaling.
2020-25
Atmanirbhar Bharat, National Logistics Policy, National Infrastructure Pipeline, stacked infrastructure and industrial-policy architecture.
2022-24
Mobile manufacturing shift: from mostly imported phones in 2014 to about 99% made in India. Second-largest producer in the world.
2025
Global Innovation Index rank reaches 38 (from 81 in 2015). The startup ecosystem is among the three largest in the world.
2025
National Manufacturing Mission announced in Budget 2025-26, covering small, medium and large industries.
2025
Three sovereign credit upgrades in a single year: Morningstar DBRS (May), S&P Global Ratings (August, its first upgrade of India in 18 years) and Japan’s R&I (September).
Early 2026
India-EU free trade agreement negotiations concluded in January 2026, nearly two decades after talks began.
Early 2026
MoSPI moves the GDP base year from 2011-12 to 2022-23 (February). Nominal GDP for 2025-26 is revised from about ₹357 lakh crore to about ₹345.5 lakh crore. The provisional estimate released in June puts 2025-26 real growth at 7.7%.
2025-26
Real GDP growth 7.7%. Total exports of goods and services reach $860 billion in 2025-26, up 4.2%. In late 2025 the IMF graded India’s national-accounts data ‘C’, citing gaps such as the measurement of the informal sector; the new base series is partly a response.
15 · The climbFour numbers

The ascent, quantified.

7.7%growth
Real GDP growth in 2025-26, provisional estimate on the new 2022-23 base. Growth has averaged roughly 6-7% a year over the past decade outside the pandemic year.
MoSPI, Provisional Estimates, June 2026
~₹2.4 L crinvested
Cumulative investment under PLI schemes across 14 sectors by March 2026. About 14 lakh jobs reported.
DPIIT, 2026
~$860 Bexports
India’s total exports of goods and services in 2025-26, up 4.2%, with services doing most of the lifting.
Ministry of Commerce, April 2026
~$720 Breserves
Foreign exchange reserves in the week to 6 November 2026 ($719.55 billion), among the largest in the world.
RBI Weekly Statistical Supplement
What worksFour growth cases

Four growth models.

China · 1990-2010

The manufacturing-led miracle

China kept manufacturing at around 30% of GDP through two decades of very fast growth (World Bank), pulling well over a hundred million workers off farms into factories. The original template for what India’s National Manufacturing Mission is attempting, at a different starting point and with different political conditions.

Vietnam · 2000-present

The FDI-enabled convergence

Vietnam raised manufacturing from about 17% of GDP in 2010 to about 24.5% in 2025, largely through disciplined FDI attraction and trade-agreement-driven market access. India’s recent trade deals, with the UAE and Australia (2022), EFTA (in force 2025), the UK (signed 2025) and the EU (concluded 2026), are partly an attempt to follow that path.

India · The IT services story

Services-led growth at a billion people

India’s IT services export story (over $200 billion a year) is the clearest example in developing-country economics of a services sector generating formal middle-class jobs at population scale. The question for the next decade is whether manufacturing can do the same at an even larger employment scale.

India · Mobile manufacturing

From importer to second-largest producer

By the government’s count, India went from 2 mobile-manufacturing units in 2014 to about 300; from mostly imported phones to about 99% made at home; from negligible exports to about ₹2 lakh crore of smartphone exports in 2024-25. The clearest case of PLI delivering structural transformation in a single sector at scale. The template other sectors (textiles, electronics components, semiconductors) are being designed to follow.

What would workSix levers

Six things that would close the last mile.

01
Deepen labour-intensive manufacturing
PLI has worked best in capital-intensive sectors (electronics, pharma, auto). The next wave must target labour-intensive sectors, textiles, footwear, leather, toys, food processing, where far more jobs are created per rupee of investment. PM MITRA textile parks, footwear focus-product scheme, and the National Manufacturing Mission are the vehicles.
02
Fix the ease-of-doing-business residual
India has made enormous progress but state-level variation remains large. Land acquisition, contract enforcement, and utility connections are the three persistent drags. State-to-state EoDB rankings (DPIIT) are creating productive competition; sustained push for convergence would close the gap.
03
Invest in skilling for modern manufacturing
Industry 4.0 manufacturing needs different skills than 1990s assembly. ITI modernisation, National Apprenticeship Promotion Scheme (NAPS), and industry-integrated B.Voc / B.Sc programmes are the scaffolding. Scale and quality are the gaps.
04
Close trade agreements
Agreements with the UAE, Australia and EFTA are in force; the UK deal was signed in 2025 and EU talks concluded in January 2026. These matter more for Indian manufacturing than they’re credited for. Tariff rationalisation and ruleset predictability attract global supply chains. The template: Vietnam and Mexico’s FTA-led manufacturing expansion.
05
Build the infrastructure behind the factory
Ports, logistics, power reliability, roads. Most of India’s manufacturing underperformance relative to Vietnam, Bangladesh, or Thailand is logistics-cost, not labour-cost. National Logistics Policy 2022 is the framework; execution is ongoing.
06
Protect macro stability
Fast growth without macro stability does not last, as Argentina shows. Fiscal consolidation, inflation targeting, independent RBI, and a disciplined current-account stance are the unglamorous foundations on which high growth compounds. Inflation targeting since 2016 and post-Covid fiscal consolidation have made the framework more disciplined; staying the course matters.
On the numbers

GDP figures come from the Ministry of Statistics & Programme Implementation. A new base-year (2022-23) GVA series was introduced in 2026 with slightly different methodology from the earlier 2011-12 series; older comparisons in this chapter use the earlier series. Manufacturing-share figures vary by source; the chart uses World Bank data for comparability across countries.

FDI and export figures come from RBI and Ministry of Commerce; PLI figures from DPIIT. All are directional.

Growth-rate projections vary across IMF, World Bank, ADB and domestic sources. The 7.7% figure for 2025-26 is MoSPI’s provisional estimate (June 2026) on the new base and may be revised. Dollar rankings of GDP move with the exchange rate as much as with growth.

Sources & further reading

Primary data: MoSPI National Accounts (2022-23 base; Provisional Estimates 2025-26); Economic Survey 2025-26; Ministry of Commerce & Industry; DPIIT; RBI Weekly Statistical Supplement; IMF World Economic Outlook (April and October 2026); World Bank WDI via Our World in Data.

Research: Ideas for India; India Brand Equity Foundation; World Bank India Development Update; WIPO Global Innovation Index 2025; Arvind Subramanian, Raghuram Rajan, Pinaki Chakraborty.

Commentary: Mint; Business Standard; Hindu BusinessLine.

Part 16Build-out · Physical and digital

The build-out.

India’s physical and digital infrastructure has expanded at a pace few large economies match. National highways from about 91,000 km to about 146,000 km. Electrified broad-gauge railway from about a third of the network to almost all of it. Operational airports from 74 to about 160. Installed electricity capacity from about 250 GW to over 550 GW. Metro rail from 5 cities and 248 km to 26 cities and nearly 1,200 km. Internet subscribers from about 25 crore to over 110 crore. A decade of build-out. The gaps remain; the pace has been real.

If a single Indian of ordinary means were to describe what changed most visibly in their everyday environment over the past decade, it would not be a policy or a slogan. It would be the road. The fact that a bus from their village reaches the district headquarters in two hours, not five. That the phone they bought for under eight thousand rupees streams video at speeds that would have been premium-tier broadband in 2015. That their train has stopped running on diesel. That the neighbouring town now has an airport.

This is the quiet infrastructure story of the past decade, and it is an unusually consequential one. Infrastructure rarely makes headlines except when something goes wrong. But under the noise, a set of structural build-outs have happened simultaneously: national highways, rail electrification, regional airports, metro rail, installed power capacity (see the Energy chapter), the payments stack, the broadband stack, ports and waterways, and the supply-chain logistics network.

None of this is complete. Highway quality varies sharply by state. Railway modernisation is uneven. Airport expansion has concentrated in tier-1 and tier-2 cities; tier-3 connectivity lags. Urban metro networks are partial in most cities. Broadband last-mile quality varies by district. The direction of travel is strong; the finish line is not close.

March 2014
91.3k km
March 2019
132.5k km
2024
146.2k km

National highway network length, thousand km. Source: Ministry of Road Transport and Highways (91,287 km in 2014; 1,46,195 km in 2024). National highways are about 2% of India’s total road length but carry a large share of its traffic.

Global context

India’s national highway length grew from about 91,000 km in 2014 to about 146,000 km by 2024. Construction peaked at about 37 km a day in 2020-21 and has stayed near or above 28 km a day since, against about 12 km a day in 2014-15.

For scale: China’s expressway network is over 180,000 km; the US Interstate system is about 78,000 km. India’s access-controlled expressways remain a small slice of its national highways, though several thousand kilometres are being built under Bharatmala.

What has been doneA decade of build-out

The scaffolding, extended.

The pace of infrastructure build-out over the past decade is difficult to overstate, even for those who track it closely. What sits below is a compressed timeline of the structural shifts, roads, rail, air, urban transit, power, digital, that together reshape what is physically possible for people and firms operating in India.

2014
~91,000 km national highway network. About a third of the broad-gauge rail network electrified. 74 operational airports. Installed electricity capacity ~250 GW. Metro rail in 5 cities. UPI does not yet exist.
2015-17
Sagarmala, the port-led development programme, approved (2015). UDAN regional air connectivity scheme launched (2016; first flight 2017). Bharatmala Pariyojana Phase I, the highway programme behind much of the later build-out, approved (October 2017).
2017-18
GST rollout reshapes interstate logistics; the old “border check-post” model collapses, with measurable gains in truck turnaround times.
2019-20
Vande Bharat Express enters service (February 2019). Work starts on the first Regional Rapid Transit System corridor, Delhi-Meerut. Jal Jeevan Mission launched (August 2019). UPI crosses 100 crore transactions a month (October 2019).
2021
PM Gati Shakti National Master Plan launched, a digital platform integrating infrastructure planning across 16+ ministries. One of the more consequential governance-of-infrastructure reforms in decades.
2022
National Logistics Policy notified. 5G services commercially launched in India.
2023
Installed power capacity crosses 400 GW. Most of the Eastern and Western Dedicated Freight Corridors are now running. The first RRTS section opens (October).
2024
National highway network reaches about 146,000 km. 5G, launched in October 2022, reaches most districts, among the fastest rollouts anywhere.
2025-26
Broad-gauge electrification reaches 99.6%. Metro rail in 26 cities, nearly 1,200 km, the third-largest network in the world. Airports about 160. Installed power capacity 552 GW (July 2026), 54% of it non-fossil. UPI handles over 25 billion transactions a month (October 2026). Internet subscribers cross 111 crore.
16 · The buildFour numbers

The decade, in four figures.

~146kkm
National highway network, 2024 (up from ~91k in 2014), an increase of about 60%.
MoRTH Annual Report 2023-24
99.6%electrified
Of India’s broad-gauge railway network is now electrified (about a third in 2014). Few large rail systems have converted this much track this fast.
Ministry of Railways, 2025-26
~160airports
Operational airports across India (74 in 2014). UDAN regional connectivity scheme has added tier-2 and tier-3 city links, though utilisation remains uneven.
Ministry of Civil Aviation, 2025
~50%of global RTP
Of the world’s real-time-payment transactions now happen on India’s UPI rails, a system that did not exist before 2016 (ACI Worldwide, 2023 data). About 25.5 billion transactions worth ₹31.5 lakh crore in October 2026. An IMF note in 2025 called it the world’s largest retail fast-payment system by volume.
NPCI; ACI Worldwide; IMF 2025
What worksFour cases

Four case studies.

India · 2021-ongoing

PM Gati Shakti: the planning layer

The Gati Shakti National Master Plan integrates infrastructure project data from 16+ ministries and all states into a single GIS platform. Roads, rail, telecom, pipelines, power transmission, and logistics clusters can be planned with visibility to each other rather than in silos. The old practice of building a road only to dig it up for a water pipeline six months later, and both again for a telecom cable, is what the platform is meant to end, though independent evaluations of its effect are still scarce. A governance innovation as much as an infrastructure one.

India · 2016-ongoing

UPI and the digital payments rails

The Unified Payments Interface, a public digital infrastructure layer operated by NPCI, enabled real-time interoperable payments across banks. From zero in 2016, UPI now accounts for about half of the world’s real-time payment transactions by volume and handles over 25 billion a month; an IMF note in 2025 described it as the largest retail fast-payment system in the world. The marginal cost of sending money from one Indian to another has fallen to effectively zero. The second-order effects on small-merchant commerce, gig-work payouts, and MSME working-capital cycles are still being worked out.

China · 2008-2020

The high-speed rail decade

China built the world’s largest high-speed rail network, from its first dedicated line in 2008 (Beijing-Tianjin) to about 38,000 km by the end of 2020, and over 45,000 km since. The lesson most cited: sustained political commitment over a decade, plus predictable financing, plus technology transfer that became indigenous capability. India’s Vande Bharat, RRTS, and upcoming Mumbai-Ahmedabad bullet train are the adapted framework; the scale is meaningfully smaller, the institutional architecture comparable.

India · 2019-ongoing

Metro rail: from 5 to 26 cities

Operational metro rail grew from 248 km in 5 cities in 2014 to nearly 1,200 km in 26 cities by 2026, with Delhi-NCR, Mumbai, Bengaluru, Chennai, Hyderabad, Kolkata, Kochi, Jaipur, Lucknow, Nagpur, Ahmedabad, Kanpur, Pune and Navi Mumbai among them. India now has the third-largest metro network in the world, after China and the US. Ridership varies widely; Delhi Metro has logged record days of over 7 million passenger journeys, while several newer systems run well below projected traffic.

What would workSix levers

Six things that would extend the decade.

01
Finish the modernisation on paper
Dedicated Freight Corridors are nearly operational; Vande Bharat is expanding; the Regional Rapid Transit System has one working corridor. The next phase is completing the rolling stock, station modernisation, and freight-shift pricing that actually delivers the mode shift from road to rail.
02
Shift focus from build to operate-and-maintain
India has built a lot of infrastructure in a decade. The institutional muscle for operating and maintaining it, particularly at municipal and district levels, remains under-built. Maintenance budgets, asset registers and user charges are where this starts.
03
Extend regional connectivity, carefully
UDAN has connected many tier-2 and tier-3 cities by air. Utilisation is mixed. Better route economics, not more routes, is likely the next-phase question. The same applies to Vande Bharat and expressway extensions beyond the trunk network.
04
Integrate infrastructure planning with environmental review
Gati Shakti has made infrastructure planning more integrated across ministries. Environmental clearances, forest clearances, and community consultations have often lagged the engineering timelines. Building these into the same digital platform, rather than treating them as end-stage hurdles, would reduce both project delays and community conflicts.
05
Close the urban transit gap in tier-2 cities
Metro networks are partial in most of the 26 cities that have them and absent in most others. Light rail, bus rapid transit, and e-bus networks are cheaper and faster to deploy. PM e-Bus Sewa is the funding vehicle; state and ULB procurement capacity is the constraint.
06
Price digital infrastructure access as a right
UPI is free for citizens; the cross-subsidy mechanics for banks and PSPs will need careful tuning as volumes scale further. The policy question is how to keep the open, interoperable, free-to-citizen model viable as the infrastructure matures. This is the next decade’s DPI question and is genuinely novel.
On the numbers

Infrastructure metrics in India come from multiple ministries with distinct reporting frames, MoRTH for roads, Ministry of Railways for rail, DGCA and AAI for airports, MoP for power, CEA for generation capacity, DoT and TRAI for telecom, MoHUA for metros. Where state-level data exists, it varies in comparability across reporting periods.

Headline figures here are rounded and drawn from the most recent government releases. “Kilometres built” numbers can vary across sources depending on whether they count additions, widening, upgrades, or the total network. Treat all specific figures as directional indicators of pace and scale.

The infrastructure build-out is broad-based but not uniform; state-level gaps are substantial. The data here captures the national picture.

Sources & further reading

Primary data: Ministry of Road Transport and Highways; Ministry of Railways; Ministry of Housing and Urban Affairs (metro rail); Airports Authority of India; Central Electricity Authority; TRAI quarterly performance indicators; NPCI UPI statistics.

Research: EAC-PM working papers on infrastructure; Economic Survey 2025-26 infrastructure chapter; PRS Legislative Research Union Budget analyses; Observer Research Foundation infrastructure series.

Policy: PM Gati Shakti National Master Plan; National Logistics Policy 2022; National Infrastructure Pipeline; Bharatmala, Sagarmala, UDAN; Dedicated Freight Corridor Project documentation.

AboutThe creator & the community

The people
behind this.

A brief note on who built this, why, and what else they do.

Yash Agarwal

Yash is a technology and internet policy practitioner based in New Delhi. His work focuses on internet governance in South Asia. He previously served as Twitter India’s first Public Policy Fellow from South Asia, held government affairs advisory roles at Chase Advisors (formerly Chase India), and was a LAMP Fellow in the Indian Parliament.

He teaches as guest faculty at nearly 40 institutions in India, serves on Boards of Studies at multiple universities, and advises organisations working at the intersection of public policy, technology, and education.

He is also the founder of Public Policy India (PPI).

Find him at yashagarwal.info or on LinkedIn.

Public Policy India

Public Policy India (PPI) is the first, largest and most vibrant pan-India community of public policy and social impact professionals, students and institutions. It runs 40+ city chapters in 25+ cities, The Policy Post newsletter and in-person Policy Circles, and STRIDE is its policy think tank.

The community exists to make public policy less abstract and more accessible for students, early-career professionals, and anyone curious about how India actually works. Many Indias is a PPI data project, part of a broader effort to put credible, sourced data about the country into the hands of people who want to understand it without wading through three PDFs and two dashboards to do so.

Find PPI at publicpolicyindia.com.

About this project

Many Indias is a single-page data dashboard and reference series covering sixteen themes that shape everyday life in India. The underlying data is drawn from credible, publicly available government and independent sources (listed on the dashboard itself and at the bottom of each chapter). The project is opinionated about how to read the numbers but tries to be transparent about the sources and their limits.

Corrections, suggestions, and arguments are welcome. The best way to send them is through the PPI website or LinkedIn.

New Delhi · 2026